Civic Issues
Topics getting the most attention in Belleville public meetings, ranked by how frequently they are discussed.
13 issues in roads
West Main Street project IDOT funding
The committee is considering spending $228,000 in TIF 3 funds to have Kaskaskia Engineering Group finalize design plans for a streetscape upgrade along West Main Street between 12th and 17th streets. This is the design phase — construction would come later.
Route 159 closure for Labor Day Parade
The council adopted Resolution 3589 asking IDOT to let the city close Route 159 for the St. Patrick's Day Parade on March 13, 2027. The parade also got its street closure and city services approved under communications.
Royal Heights Road Shared Use Path
The city is spending $105,800 on design work for a shared-use path along Royal Heights Road from Abraham Lincoln Elementary to Memorial Drive, tied to a Safe Routes to School grant. It should make the walk to school safer for kids.
FY2027 Street Program Contracts
The city's yearly purchasing contracts for aggregates, asphalt, culverts and concrete — the raw materials behind street repairs — were up for renewal at a combined cost near $365,500.
Two-way stop on South 18th Street
A Traffic Committee motion would install a two-way stop where South 18th Street meets South 19th Street.
North Douglas Avenue improvements
Up to $127,750 in engineering survey and design work was proposed for North Douglas Avenue from East Main to Sycamore, funded through HRST.
Smithton Township Road Maintenance Agreement
A five-year deal for the city to maintain 1.4 miles of Schlueter Germaine Road and Country Side Lane for Smithton Township at $9,800 per year, using Motor Fuel Tax money.
Parking congestion on South 5th Street at West Cleveland
Residents say apartment-complex tenants parking on South 5th make the turn from West Cleveland dangerous and the street is deteriorating. The committee approved alternating no-parking to keep the street clear.
Fair St. Clair street closure
South Belt East will close from IL-159 to Freeburg Avenue for the Fair St. Clair festival, with local traffic only between Freeburg Avenue and Church Street.
E. Monroe, Abend and E. Adams street improvements
A $383,447 contract with KRB Excavating would resurface three east-side streets with new sidewalks, curbs, and patching. This directly affects residents on those streets.
Traffic safety at 29th and Godfrey
A resident said the city's roughly $1 million intersection improvement at 29th and Godfrey now lets drivers speed through at high speeds, endangering children walking to school near his yard signs.
Roads and bridge inspection contracts
The council approved engineering contracts for easement work, annual bridge inspections, stormwater sampling and a CDBG application for North Douglas Avenue.
Freeburg Avenue roundabout at IL-158/IL-13
The state-federal roundabout project at IL 158 and IL 13 needs the city to sign a joint funding agreement, but the language could make Belleville cover unlimited cost overruns plus all lighting and curb maintenance on state-owned legs of the intersection. Council tabled it until IDOT responds.