Civic Issues

Topics getting the most attention in Bensenville public meetings, ranked by how frequently they are discussed.

Filtered to Water Utilities

11 issues in water utilities

HighWater Utilities

Addison Creek Storm Sewer Phase III

The last phase of the flood-relief storm sewer project will connect existing culverts to Redmond Pond, finally letting water discharge as designed. No flooding has occurred in the central residential area since Phase One began.

1 mention (1 this month)Last discussed Nov 17, 2026
HighWater Utilities

Lead water service line replacement program

The state is mandating replacement of lead water service lines, and the village is seeking IEPA loan funding with principal forgiveness to help pay for it. The public hearing is a required step in the loan process.

2 mentions (1 this month)Last discussed Oct 27, 2026
MediumWater Utilities

Water Tower Painting and Maintenance

The village's two water towers will get re-coating, structural repairs, safety upgrades and a new mixer, funded by a low-interest IEPA loan of up to $4.1 million — with a chance of up to 50% principal forgiveness.

2 mentions (1 this month)Last discussed Oct 27, 2026
LowWater Utilities

Stormwater management easements at two developed sites

A daycare site on Irving Park Road and the Walnut Grove townhomes are formally dedicating permanent stormwater easements — a condition of their building permits — so the village can maintain and repair drainage facilities into the future.

1 mentionLast discussed Sep 22, 2026
HighWater Utilities

Five-Year Water and Sewer Rate Increases

Your water bill goes up starting January 2027 and every year through 2031. A typical household will pay about $10.46 more per month by year one; seniors about $6.28. The money funds lead service line replacement and keeps the utility fund from going broke in 2029.

1 mentionLast discussed Aug 25, 2026
MediumWater Utilities

Church Lift Station relocation for old police station redevelopment

The vacant old police station site can't attract developers while a 60-year-old lift station and underground utilities sit on it. Moving them opens the door for possible townhome development.

1 mentionLast discussed Jul 28, 2026
LowWater Utilities

Water Line Insurance Solicitations

Residents have been getting water line insurance mailings; the Village posted a fact sheet on social media to help people sort it out.

1 mentionLast discussed May 19, 2026
HighWater Utilities

Recurring flooding in Algonquin Avenue and Mohawk-Braniger neighborhoods

A resident with a signed petition described decades of flooding and demanded a firm timeline. Public Works said engineers from Strand Associates are studying four flood-prone sub-basins, with solutions expected in the coming months, but the Village can't yet guarantee a construction schedule because stormwater funds are limited and will be prioritized across competing areas.

1 mentionLast discussed Apr 28, 2026
MediumWater Utilities

Sanitary Sewer Lining on Marshall Road

The village is lining 3,711 feet of aging sewer mains on Marshall Road using a trenchless method that avoids digging up streets.

1 mentionLast discussed Mar 24, 2026
HighWater Utilities

Fiber-to-the-home internet for every residence

Ezee Fiber will build a fiber network serving every residential property, offering 1-3 Gbps speeds. Construction starts around mid-summer 2026 and could run into 2027, with most lines drilled underground near sidewalks. The village holds securities to guarantee restoration and will control the rollout pace.

1 mentionLast discussed Feb 24, 2026
MediumWater Utilities

Industrial wastewater pre-treatment at 450 Evergreen Street

Distinct Foods installed a 13-foot pre-treatment device in its front yard without permits to keep fats, oils and grease out of Village sewer lines. The Commission allowed it temporarily with a one-year deadline for a permanent structure.

1 mentionLast discussed Jan 6, 2026