Civic Issues
Topics getting the most attention in Bensenville public meetings, ranked by how frequently they are discussed.
18 issues with medium priority
Gap Sidewalk Improvements (NITA Grant)
A $904,704 grant will add nearly 4,000 feet of sidewalks and ADA ramp upgrades within a half mile of the train station, making the walk to Metra safer and more accessible.
Village Insurance Renewal
The village negotiated a self-insured structure with its insurance pool for property, liability, cyber and workers' comp coverage, saving over $263,000 versus the prior year.
Public Safety Equipment and Facilities
A $280,000 purchase replaces aging body-worn and squad-car cameras, which the village bought early (2021) ahead of the state's 2025 mandate, earning grant money along the way.
Water Tower Painting and Maintenance
The village's two water towers will get re-coating, structural repairs, safety upgrades and a new mixer, funded by a low-interest IEPA loan of up to $4.1 million — with a chance of up to 50% principal forgiveness.
Irving Park Road parcel consolidation for future commercial development
Three adjoining parcels on about 2 acres at 227-239 W Irving Park Road merge into one lot, clearing the way for future commercial redevelopment once the existing buildings come down.
Residential driveway width rules relaxed
Homeowners will soon be able to build driveways up to 20 feet wide instead of 10, and rear-yard parking pads are allowed without a detached garage — rules meant to stop paver-edging workarounds while keeping yards from becoming parking lots.
Truck repair facility at 1220 Mark Street
VSP Logistics wanted to run a truck repair and maintenance shop on Mark Street, but the lot is too small for semis to turn around without blocking traffic near Route 83. The board denied the permit unanimously, agreeing the site can't handle it — not the business itself.
Marion Street Roadway and Watermain Improvements
The village is applying for a $600,000 federal CDBG grant to rebuild Marion Street — replacing 600 feet of aging watermain, fixing undersized storm sewers, and repaving a road rated 'very poor.'
Theatre projector replacement at the Bensenville Center Theatre
Aging theatre projectors that keep breaking down will be replaced for up to $94,202.06.
New European specialty auto repair shop on Park Street
Royce Auto wanted a second location for inspections, light mechanical work and detailing. The commission approved it with conditions keeping all work indoors and banning painting, engine repairs and outdoor vehicle storage.
Fenton High School Security Fence
A new fence along Fenton High School's northern edge will keep students from crossing the railroad tracks, improving safety near the athletic fields.
Downtown zoning and the 26 N Center Street house
Property owners wanted to rezone a two-unit downtown building to allow a ground-floor residence, but the village said no to protect its mixed-use downtown redevelopment vision.
Church Lift Station relocation for old police station redevelopment
The vacant old police station site can't attract developers while a 60-year-old lift station and underground utilities sit on it. Moving them opens the door for possible townhome development.
Republic Services waste contract extension with 4% annual increases
Trash, yard waste, and recycling service stays the same through 2031, but residents will see the rate climb 4% each year under the amended contract.
2026 Pavement Preventive Maintenance Program
The village will spend about $112,000 applying Reclamite to streets paved in 2024-25, extending pavement life 5-10 years and avoiding costlier repaving later.
Cosmetic auto repair shop at 1081 Entry Drive
Autotec Reconditioning got the go-ahead to run a dealership-focused paint and dent repair shop in the light industrial district, limited to indoor cosmetic work only.
Additional parking for Energy Sports Complex
The sports complex at 1005 Commerce Court is adding 36 net new parking spaces, with code deviations for tighter stalls and aisles granted only for the new area.
230 Park Street Special Use Permit Denial
A proposed auto repair shop was denied because the lot is short on parking, has little yard space, and sits in an area already heavy with vehicle repair businesses.