JH

Jennifer Hendricks

Village Trusteeoath item in the board minutes; month-level end per same minutes; 2025-05-12 - 2029-05-01

No biography on file yet.

At a glance

News mentions
0

Term ending May 1, 2029.

Voice

Meetings spoken in
27
Total speaking time
55:44
Avg per meeting
2:04
Segments
687

Want every word Hendricks has said?

The OpenCity MCP for Claude.ai answers questions like “what has Hendricks said about housing this year” with one prompt — full speaking history, with YouTube timestamps.

Filtered to Roads

Top issues during term (14)(Roads)

high↓Apr 2026[16]

November 3rd referendum for 25-year road improvement program

A successful referendum would raise property tax rates to fund long-term street repairs; the consulting agreement itself is a modest contract cost.

high↓Feb 2026[14]

Maple Avenue construction

The water main work totals about $949,400 in construction plus $70,300 in engineering, with the resurfacing project receiving 80% STP funding.

high↑Jan 2026[11]

Downtown Employee Parking Realignment

Daily rates at premium lots would rise from the proposed $3.50 to $4.

high↑Jan 2026[11]

Prairie Avenue Surface Transportation Project

The village's share of the lighting options runs about $70,000-$85,000 through Grant, and roughly $225,000 if extended to Washington; full decorative lighting to 31st Street would cost about $450,000.

high↓May 2026[7]

Regional 31st Street bike trail project

The village's share would be 20% of phase two costs if the 80% federal-state grant is awarded in the spring.

high↓Apr 2026[6]

2027 Street Improvements Program

About $2.1 million combined for construction and engineering — within the budgeted amount.

high↓Jun 2026[6]

Unpaved alley maintenance

Residents would pay nothing extra under full Village funding, or roughly $10,000–$20,000 per 50-foot lot under a 50/50 cost share, typically spread over ten years.

high↓May 2026[6]

Energize Ogden Avenue corridor project

A resident cited Westchester's roughly $26,000 annual dispensary tax revenue as too small to justify the impact.

medium↓Sep 2026[5]

2026 Sidewalk Improvements Change Order

$28,675.50 in additional work within the already-budgeted sidewalk program.

medium↓Jun 2026[2]

Alley access and traffic circulation at Ogden/Du Bois

Paving the alley was floated as a possible condition of approval, with cost unquantified.

medium↓Jun 2026[2]

Hollywood grade crossing construction detours

medium↓Jul 2026[2]

Brookfield Avenue street improvements funded

The village expects to pay only 20% of construction costs, with grants covering the rest.

medium↓May 2026[1]

2026 Street Improvements Project Additions

Up to $22,400 more in engineering costs plus the Raymond Avenue block added to the paving scope.

medium↓Jan 2026[1]

Federal road grant applications (STP-Local)

Roughly $4.5 million of about $18 million in project costs would come from local tax dollars.

Decisions during term (0)

Recorded while Hendricks was in office — not necessarily decisions they moved, spoke to, or voted on.

No decisions found matching Roads.

Voting record (0)(Roads)

No votes found matching Roads.