Kathryn S. Kaluzny
No biography on file yet.
Voice
- Meetings spoken in
- 28
- Total speaking time
- 1:07:57
- Avg per meeting
- 2:26
- Segments
- 990
Want every word Kaluzny has said?
The OpenCity MCP for Claude.ai answers questions like “what has Kaluzny said about housing this year” with one prompt — full speaking history, with YouTube timestamps.
Top issues during term (14)(Roads)
November 3rd referendum for 25-year road improvement program
A successful referendum would raise property tax rates to fund long-term street repairs; the consulting agreement itself is a modest contract cost.
Maple Avenue construction
The water main work totals about $949,400 in construction plus $70,300 in engineering, with the resurfacing project receiving 80% STP funding.
Downtown Employee Parking Realignment
Daily rates at premium lots would rise from the proposed $3.50 to $4.
Prairie Avenue Surface Transportation Project
The village's share of the lighting options runs about $70,000-$85,000 through Grant, and roughly $225,000 if extended to Washington; full decorative lighting to 31st Street would cost about $450,000.
Regional 31st Street bike trail project
The village's share would be 20% of phase two costs if the 80% federal-state grant is awarded in the spring.
2027 Street Improvements Program
About $2.1 million combined for construction and engineering — within the budgeted amount.
Unpaved alley maintenance
Residents would pay nothing extra under full Village funding, or roughly $10,000–$20,000 per 50-foot lot under a 50/50 cost share, typically spread over ten years.
Energize Ogden Avenue corridor project
A resident cited Westchester's roughly $26,000 annual dispensary tax revenue as too small to justify the impact.
2026 Sidewalk Improvements Change Order
$28,675.50 in additional work within the already-budgeted sidewalk program.
Alley access and traffic circulation at Ogden/Du Bois
Paving the alley was floated as a possible condition of approval, with cost unquantified.
Hollywood grade crossing construction detours
Brookfield Avenue street improvements funded
The village expects to pay only 20% of construction costs, with grants covering the rest.
2026 Street Improvements Project Additions
Up to $22,400 more in engineering costs plus the Raymond Avenue block added to the paving scope.
Federal road grant applications (STP-Local)
Roughly $4.5 million of about $18 million in project costs would come from local tax dollars.
Decisions during term (0)
Recorded while Kaluzny was in office — not necessarily decisions they moved, spoke to, or voted on.
No decisions found matching Roads.
Voting record (0)(Roads)
No votes found matching Roads.