5 issues in water utilities
Sanitary Sewer System Compliance
A consent ordinance would update Lake County sewer utility fees, affecting how sewer service charges are set for properties tied to the county system.
Public Works Water Service Truck Replacement
The Village is replacing its 2010 water service utility truck — the rig crews take to water main breaks and hydrant repairs — with a 2028 Freightliner for up to $318,611. The old truck has logged over 800 water main break responses and 11,200 engine hours.
Lake County Water Interconnection and Palatine Meter Agreement
Two consent items strengthen regional water cooperation: a design engineering agreement with Lake County for a water interconnection and an updated antenna-sharing deal with Palatine for the water meter reading program.
Thermal imaging camera for building and fleet maintenance
Public Works asked for $2,000 for a professional-grade thermal camera to spot water leaks, electrical hot spots and failing equipment before they turn into expensive repairs — replacing hundreds-per-hour contractor visits.
Twenty-Year Water Pro Forma
The water fund can pay for its own capital improvements through 2029, then the village plans bonds in 2030 and 2033 to replace aging infrastructure — about $64 million of work through 2036. Water rates from the North Shore commission may rise 5% a year starting in 2027.