Civic Issues
Topics getting the most attention in Cary public meetings, ranked by how frequently they are discussed.
7 issues in roads with medium priority
2027 Annual Roadway Resurfacing Program design
HR Green was hired (up to $52,405 with contingency) to design this year's road resurfacing, and $1.2 million in motor fuel tax funds were appropriated to maintain roadways.
Georgetown Drive and Three Oaks Road intersection improvements
Only one bid came in for this intersection improvement and it was far above the engineer's estimate, so the village is rejecting all bids and will rebid the project.
Street sweeping efficiency
Chris Reike suggested the village buy its own street sweeper rather than contract out, saying the contractor zooms past clean streets and missed November leaf pickup entirely last year.
Route 14 speed limit reduction
IDOT dropped the speed limit on Route 14 from 35 to 30 mph between Janice Cutoff and Borden — and the village found out when the signs went up.
PACE transit extension
The mayor wants to extend PACE bus service along Route 14 to connect Cary's Metra depot with neighboring communities, now that the new NITA regional transit board is running.
Emergency pavement patching after water main repairs
Water main breaks left uneven pavement on Margaret Terrace, Silver Lake Road, and Three Oaks Road. The board waived bidding rules to get Geske and Sons on the job quickly for up to $52,550.69 with contingency.
Snowplow equipment purchase for new plow truck
The village bought a new Peterbilt plow truck chassis in June and now approved the $152,020.62 outfitting package so the truck is ready for snow season.