Civic Issues
Topics getting the most attention in Deerfield public meetings, ranked by how frequently they are discussed.
2 issues in water utilities with high priority
Ezee Fiber village-wide fiber-optic network
i3 Broadband will install fiber reaching 90-95% of Deerfield homes over roughly two years, mostly in rear yards. Residents get 30-day notifications, no Saturday work, and a $100,000 restoration bond the village can draw on. You can't refuse access to utility easements, but a dedicated engineer will oversee the work and residents can appeal restoration problems through the village.
Deerfield Road pumping station pump replacement
The village is repairing its biosolids centrifuge (up to $148,400) and replacing a 30-year-old lift station pump ($36,542) to keep the sewer system running reliably.