Civic Issues
Topics getting the most attention in Deerfield public meetings, ranked by how frequently they are discussed.
6 issues in water utilities
Sewer infrastructure inspection upgrade
The Village is replacing its 2017 sewer camera with modern HD equipment that plugs into its new software, helping staff spot pipe problems early and prioritize sewer lining before expensive failures happen.
Ezee Fiber village-wide fiber-optic network
i3 Broadband will install fiber reaching 90-95% of Deerfield homes over roughly two years, mostly in rear yards. Residents get 30-day notifications, no Saturday work, and a $100,000 restoration bond the village can draw on. You can't refuse access to utility easements, but a dedicated engineer will oversee the work and residents can appeal restoration problems through the village.
Deerfield Road pumping station pump replacement
The village is repairing its biosolids centrifuge (up to $148,400) and replacing a 30-year-old lift station pump ($36,542) to keep the sewer system running reliably.
Recurring ComEd Outages on King Richards Court
A King Richards Court resident says his power keeps going out on sunny days — even apart from the storm — and only on the west side of the street. Staff will reach out to ComEd.
Traffic signal maintenance agreement
Lake County will bill the village directly for signal maintenance at Saunders/Takeda-Amgen Way, and the village passes the cost to the private beneficiary — about $600 every three months.
Water meter purchases from Midwest Meter
Up to $100,000 for Badger-brand water meters sold to developers and used for commercial replacements; bidding waived because Midwest Meter is the sole Badger distributor and mixed brands caused problems before.