Civic Issues
Topics getting the most attention in Frankfort public meetings, ranked by how frequently they are discussed.
7 issues in roads
Pfeiffer Road reconstruction and federal grant pursuit
The village is spending $311,812 in motor fuel tax money on wetland credits required to close out the Pfeiffer Road extension project from Route 30 to south of Colorado Avenue.
Multi-use path expansion — Pfeiffer Road to 80th Avenue
The board accepted land along Pfeiffer Road for future road, bike path, and utility improvements, moving the long-planned multi-use path one step closer.
New traffic rules near schools and new subdivisions
New no-parking rules on Highland Road near Chelsea Intermediate School, stop signs in the Reserve of Copper Creek subdivision, and stop sign/no parking rules in the Frankfort Point development.
Pedestrian crossing safety at W. Laraway Road and Harlem Avenue
A Southwick subdivision resident says kids can't safely reach the Forest Preserve trail and asks for a pedestrian push-button crossing signal at Laraway and Harlem, especially with the Frankfort Point development coming.
Sight distance hazard at White Street and W. Bowen Street
A resident who lives at Elwood and Smith says drivers can't see north or south when exiting West Bowen onto White Street, especially during crowded events, and asks the village to remove one parking space to improve visibility.
2026 Roadway Maintenance Program
A $5 million road program with Robinson Engineering handling design and construction engineering at 4-4.5% fees.
Aberdeen Road Bridge replacement
The bridge in Prestwick needed emergency shoring and now a full replacement; the board hired two engineering firms to design it.