Civic Issues
Topics getting the most attention in Geneva public meetings, ranked by how frequently they are discussed.
9 issues in roads with medium priority
ADA Transition Plan adoption
The city formally adopted its ADA Transition Plan, laying out how Geneva will fix sidewalks, curb ramps, and crossings for accessibility over time. The IDOT standard detail drawings in the packet cover curb ramps and pedestrian crossings.
7th Street Bike Path Extension and ITEP Grant
The city is chasing a state grant that would cover 80% of a roughly $2 million project to pave, realign, and extend the 7th Street bike path to safely connect with Route 38. The city's share would be about $400,000.
2026 Pavement Marking, Curb and Sidewalk Program Change Order
In committee, the council approved parking garage deck repairs (about $61,000, well under budget) and the 2026 curb and sidewalk program ($255,000, scope trimmed to fit budget). Neighbors can ask for a map of which sidewalk sections are on the list.
Route 31 improvements: bus pads, sidewalks and mid-block crossing
The state will upgrade Route 31 south of Fargo Boulevard with better bus pads, sidewalks, ADA curb ramps and a new mid-block crossing. Ald. Kosirog wanted a flashing crosswalk signal, but IDOT doesn't install those. A closed sidewalk section will reopen once the project replaces a structurally failed culvert.
South Sixth Street load limit
The council endorsed the city's application for funding to cover Phase II engineering design of the South Street and South Seventh Street roadway project, contingent on the Kane County Council of Mayors reclassifying the project as active.
Kautz Road reconstruction earns APWA award
The Kautz Road widening project — done with St. Charles — won a regional Public Works Association award. It added truck access, a bike path connection, and new stormwater infrastructure, with over $4 million paid by outside grants.
State Street Pedestrian Bridge
The bridge railing project started at about $800,000 but grew by roughly $1 million when the council widened the pedestrian path. It's been deferred to next fiscal year while awaiting state authorization.
PACE VanGo commuter van program
The VanGo program would give workers a $5-a-day reservation van connecting the Geneva train station to employers along Randall Road, Kirk Road and business parks — the first VanGo location in Kane County.
Complete Streets policy
A draft policy formalizes the city's practice of designing streets for all users — walkers, bikers, drivers and all ages and abilities — with exceptions where bike lanes don't fit. It could also help win transportation grants.