Civic Issues
Topics getting the most attention in Geneva public meetings, ranked by how frequently they are discussed.
12 issues in water utilities with medium priority
Metronet fiber expansion
The city's expanding utility fiber network needs an outside contractor for installation labor and service. The proposed contract is estimated at $75,000 and budgeted, running through April 2027 with an optional extension.
Electric supply agreement amendment with WM Illinois Renewable Energy LLC
A ninth amendment to the city's electric capacity and energy purchase agreement covering calendar years 2027 and 2028. Staff confirmed the amendment count discrepancy and corrected the item before it goes to City Council.
Electric Capacity and Energy Purchase
The city would extend its agreement to buy electric capacity and energy from WM Illinois Renewable Energy LLC through 2028 — part of how Geneva secures power supply for residents.
Geneva Generation Facility engine coupler failure
The failed engine coupler at the 20-year-old Geneva Generation Facility cost $30,096 to fix, and staff warned that more component replacements are coming as the little-used plant ages. Budget talks are expected to address the remaining couplers.
Outage-management software for the electric utility
A proposed MILSOFT phone system would automate outage reporting and confirmations for electric customers, costing roughly $26,400 the first year. Members liked it but pressed on whether residents can reach a live person.
Electric system pole replacement
The city is buying about 30 wooden utility poles after system-wide testing found some needed immediate replacement — the first purchase since 2021.
Groundwater well ban and water code moratorium
Following a gas-station fuel leak near the former Duke and Lee's, the state wants the city to ban potable wells in a defined area so cleanup can be signed off. City officials stress no city wells are in the area and the public water supply is unaffected.
Industrial sewer discharge credit moratorium
A large industrial user (Lineage) asked for roughly $35,000 a year in sewer credits for water that evaporates instead of reaching the sewer. The council discussed a 12-month moratorium on that code section while a water rate study wraps up — and the mayor pushed back on the discussion getting too user-specific.
Keslinger substation upgrades
The council approved a $148,901 automated switch for the Keslinger substation and, in committee of the whole, a $354,072 engineering agreement with Stanley Consultants for the substation upgrade.
Water system leak detection
The council approved the final year of a three-year, $35,000 leak detection survey covering roughly 90% of the city, valve by valve, to find and fix hidden water leaks and conserve water.
Electric distribution material purchases
The city locked in up to $560,000 of materials for 2027 electric distribution projects and up to $100,000 for transformers, keeping the municipal electric system supplied.
Sanitary sewer rehabilitation
The city will rehabilitate sanitary sewers for up to $280,000; the low bid came in above budget, so some work items will be trimmed to keep costs in line.