Civic Issues
Topics getting the most attention in Hinsdale public meetings, ranked by how frequently they are discussed.
6 issues in water utilities
Lead service line replacement policy and funding
State and federal law now require the village to replace all lead service lines over ten years. The 2027 budget funds the first year at roughly $600,000 for construction plus $60,000 in engineering.
2026 Sanitary Sewer Rehabilitation and Lining
The village hired National Power Rodding for $57,043.55 in extra sewer cleaning, televising and root cutting, within an $80,000 budget — routine work that keeps the pipes flowing.
South Garfield Street drainage study
Standing water near South Garfield at 50th and 56th Streets has worsened after recent storms. HR Green will do a $34,450 hydraulic study — the first step toward fixes and grant funding.
Water system reliability: Well #5 repair, Well #10 retirement
A stretch of winter freeze-thaw caused multiple water main breaks, outpacing the village's in-house crew and $32,000 repair budget. The board ratified $38,310 in outside contractor work.
2026 water rate increase (Option 1)
President Hart announced a new working group to figure out how to fund water system needs — including the resident share of lead line replacements — in time for the annual May water rate adjustment.
Lead service line replacement mandate
The village hired an engineering firm to design its lead service line replacement program — about 300 homes are expected to need replacements by 2036 under state law, with competitive zero-interest IEPA loans helping fund it.