Oak Meadow Lot 5 Lot-Width Variance
Summary
A vacant wooded corner lot near the Forest Preserve is up for sale, and a variance would shrink the required corner-lot width from 180 to 140 feet so a home can be built. Neighbors oppose it, citing tree preservation and the lack of any actual home plans.
At a glance
- Total mentions
- 9
- Last 30 days
- 2
Discussed at 2 meetings in the last 60 days; most recently Oct 28, 2026.
Impact analysis
None to the village directly.
The property owner, who wants to sell the lot to a homebuilder.
Neighbors say reduced lot width and likely tree removal would erode the natural buffer along the Forest Preserve.
Mentions & discussions (3)
Village Board - Oct 28, 2026
A buyer wants to build on an oddly configured 1980s-era corner lot that needs a 140-foot width variance. Trustees said yes in principle but require the actual house plans to come back for final review — protecting against a blank-check variance.
Plan Commission - Oct 1, 2026
A wooded, odd-shaped corner lot in Oak Meadow can't be sold as buildable without cutting the required 180-foot lot width to 140 feet. Neighbors want a Forest Preserve purchase or a lot consolidation instead, citing trees, septic feasibility, and drainage; the commission said those issues belong in the permit phase.
Plan Commission - Sep 3, 2026
A vacant wooded corner lot near the Forest Preserve is up for sale, and a variance would shrink the required corner-lot width from 180 to 140 feet so a home can be built. Neighbors oppose it, citing tree preservation and the lack of any actual home plans.
Related development
Oak Meadow Lot 5 Lot-Width Variance (HG-2618-V)
A 1980s-era undersized corner lot becomes buildable, with a safeguard that the actual house plans come back before the board.
Oak Meadow Subdivision Lot 5 Lot Width Variance
Approval would open the wooded lot near the Hadley Woods Forest Preserve to home construction, which neighbors fear would mean tree removal and loss of the natural buffer.
We'll email you when it's on an upcoming agenda and when it's voted on, at most once a day.
The weekly brief for Homer Glen
What the council decided, in plain English — one email a week.
Free. Unsubscribe with one click any time. We never sell your email.