Civic Issues
Topics getting the most attention in Homewood public meetings, ranked by how frequently they are discussed.
8 issues in roads with medium priority
2026 Street Resurfacing Program funded and awarded
The village added $41,000 in Motor Fuel Tax funds and awarded the street resurfacing contract to Gallagher Asphalt for $382,307.77 — good news for the condition of local roads.
Downtown crosswalk improvement plan — Phase II
The board added $100,000 from the Downtown TIF fund to finish engineering and design for the next phase of downtown crosswalk improvements.
Overlapping downtown construction projects
The Cornell building developers are retooling their plan with larger units after their approvals expired; a PUD for the old village hall parking lot site is expected soon, and a redefined project at 1313 175th Street returns next week.
2026 Street Resurfacing Funding
$560,000 in motor fuel tax money is earmarked for fixing streets and buying rock salt for next winter.
Ravisloe neighborhood cut-through traffic and alley condition
Whenever the viaduct floods, drivers cut through Ravisloe on Pine, Cedar, and Maple. A resident asked for a temporary stop sign at Cedar and Howe during upcoming Dixie Highway viaduct construction, possible speed monitoring, and patching of the nearly unpassable alley between Cedar and Pine.
North viaduct rush-hour closures
A written comment asks why the north viaduct is closed every day during rush hour, a daily headache for commuters.
Downtown Crosswalk Improvements vs. Other Intersections
The village is spending up to $100,000 on Phase II engineering for high-visibility downtown crosswalks. Resident Joan Stalick emailed that Riegel Road and 187th Street lacks signals, signage, and lighting and needs safety upgrades too.
Dixie Highway viaduct flooding and pedestrian crossing safety
A resident welcomed the viaduct fix but asked IDOT to add a flashing push-button crosswalk while construction has the area closed, citing her husband's dangerous bike commute.