Civic Issues

Topics getting the most attention in Homewood public meetings, ranked by how frequently they are discussed.

Filtered to Water Utilities
Filtered to High

10 issues in water utilities with high priority

HighWater Utilities

Alley drainage and stormwater in the Martin/Morris area

Longtime drainage problems near 18242 Martin Avenue came front and center during the garage case. A neighbor showed photos of alley runoff flooding her yard, and the village's public works cost-share storm sewer program came up as a possible fix for the whole block.

1 mention (1 this month)Last discussed Nov 12, 2026
HighWater Utilities

Lead service line replacement program

A $3.4 million contract with Five Star Energy Services will replace lead service lines, pending state EPA sign-off — a direct health and safety win for older homes.

5 mentions (2 this month)Last discussed Nov 10, 2026
HighWater Utilities

Sanitary sewer slip lining expansion

A $17,950 budget amendment lets the contractor line 4,340 more feet of sewer pipe and reconnect 68 service lines — maintenance that helps prevent backups and street digs later.

2 mentionsLast discussed Sep 22, 2026
HighWater Utilities

Resident flooding resolved on Loomis Avenue

A first-time homeowner described repeated flooding of his Linden Road property and asked the board to expedite a drainage project already presented by Public Works in April.

4 mentionsLast discussed Sep 22, 2026
HighWater Utilities

2027 Lead Service Line Replacement Program loan

The village is in the verification phase, using hydro excavation to identify lead lines. Door-knocking and replacement work begins this week and in coming weeks.

3 mentionsLast discussed Sep 8, 2026
HighWater Utilities

ComEd grid reliability and equity

A resident urged President Hofeld to lead a coalition of about 20 Cook and Will County municipalities to demand an equity audit of ComEd's grid after repeated prolonged outages, including possible action at the Illinois Commerce Commission.

2 mentionsLast discussed Aug 25, 2026
HighWater Utilities

Water bill penalty suspension after storm outages

The village suspended the 10% late penalty on water bills unpaid as of August 21, recognizing that many households lost power — and income — during the storms.

1 mentionLast discussed Aug 25, 2026
HighWater Utilities

Emergency generator for Lift Station 1A

After two storms, the village is buying a standby generator for Lift Station 1A so sewage pumping keeps working during outages — Trustee Harris-Jones welcomed it.

1 mentionLast discussed Aug 11, 2026
HighWater Utilities

Idlewild water main repair and water costs

Trustees praised public works crews handling a string of water main breaks, and the claims list showed $680,000 in two months of water payments to Chicago Heights.

4 mentionsLast discussed Jun 23, 2026
HighWater Utilities

Ridge Road Storm Sewer and Backyard Flooding

A $1.2 million storm sewer project on Ridge Road is being prioritized after recent storms caused backyard flooding reaching homes and garages. Public Works is also offering a 50/50 share program for residential drainage fixes.

1 mentionLast discussed Apr 14, 2026