Downtown Parking and CBD Employee Lot
New consistent parking signs are coming to downtown lots and the garage, and time-limited parking will run until 8 p.m. per the parking study. Trustees flagged that some signs pack multiple messages and asked for clearer visual separation.
Lincoln and Washington Stop Sign Study
Trustees and residents flagged tall pine bushes at Washington and Lincoln blocking sight lines near a park full of kids — near-miss accidents reported. The Village Attorney will review the code and police will look at a possible stop sign.
October Road and Rail Closures
BNSF work closes Tilden Avenue on Saturday, October 17, and East Avenue near 47th Street will be closed for crossing work through the weekend. Plan ahead.
Traffic and Cut-Through Concerns South of 47th Street
Residents Linda and John Pluto say construction at East Avenue and 47th is pushing backed-up traffic onto residential streets, cutting through near Seventh Avenue School and the park, with no sidewalks west of East Avenue. They want a traffic study south of 47th, lower speed limits, and four-way stops at 7th, 8th, and 10th Avenues on 49th and 50th Streets. John Pluto also pressed for transparency about where traffic study funding is budgeted.
Neighborhood Traffic Study Coverage
John Pluto asked why traffic monitoring wires only appeared on part of town and complained about speeding on 49th and 50th Streets. Staff explained the study covers 47th Street south to the railroad tracks and Lagrange Road to East Avenue, with a preliminary report by December, and hopes to rotate studies through all neighborhoods yearly.
South La Grange Road Corridor Plan accepted
The President reported on the corridor study's market analysis and steering committee discussion of beautification, funding, density, pedestrian safety, and infrastructure — themes echoed by later speakers.
East Avenue street lights, speeding, and flood plan concerns
Resident John Pluto urged the Village to coordinate with the Park District on flood remediation and to address a 61-year-old water line crossing the park that EPA documents from 1996 suggest sits in potentially contaminated soil. He says nothing in the budget covers replacing it.
East Avenue Streetlights and Speeding
John Pluto reported six streetlights out on East Avenue for three weeks during construction, plus dangerous speeding and cut-through traffic near Sedgwick Park — and asked for more traffic enforcement.
50/50 Sidewalk Program and Public Works Operations
The 50/50 sidewalk program contract came in 30% higher than last year at $97,800 — mostly concrete and fuel costs. Residents who join still pay half, and a budget amendment of $14,800 may be needed.
IDOT Right-of-Way Procedures Resolution
A routine but real one: without this resolution, village crews would need surety bonds for any work on La Grange Road, Ogden, 47th Street, or East Avenue. It also unlocks verbal emergency permits from IDOT.
Pedestrian crossing and speed limit at 52nd Street and La Grange Road
John Pluto pressed for a signalized crossing and a 30 mph speed limit near Gurrie Middle School — an issue raised in 2010 and still unresolved 15 years later. Trustee Augustine agreed and said it's in the comp plan and South Corridor study.
IDOT 47th Street & East Avenue construction
The Manager reported utility conflicts have delayed the intersection project, with Stage 2 construction expected to begin in March 2026.