Civic Issues
Topics getting the most attention in Lombard public meetings, ranked by how frequently they are discussed.
3 issues in roads
Arterial Sidewalk Gap Improvements
An added $45,851.53 to the engineering contract would cover design and land acquisition work on sidewalk gap projects in Districts 2, 3, 5 and 6.
Traffic Congestion and Safety on Finley Road
Residents say left turns into the condos off Finley Road can take 20 minutes and want stop signs or a traffic light near the Burj/Mariano's/condo entrances. A signal is unlikely for now — the intersection is only 665 feet from the Roosevelt light, and IDOT typically requires 1,300+ feet between signals. A follow-up traffic study is recommended once the center is fully occupied.
Quality and Property Damage from Street Resurfacing Projects
The village approved a resident engineering services contract for upcoming road improvements on North Grace Street.