Civic Issues
Topics getting the most attention in New Lenox public meetings, ranked by how frequently they are discussed.
6 issues in roads with medium priority
Schoolhouse Road bike path grant
The Village is applying for a state grant to build a multi-use path along Schoolhouse Road connecting the Old Plank Road Trail to Lincoln-Way Central — a safe route that has been requested for years. The project could cost over $1 million because of a rail crossing, with a 20% local match.
Unbuilt Trail and Traffic Projects from the 2018 Plan
Resident Thomas Nowak urged the village to consider swapping double sidewalks in new subdivisions for a multi-use path on one side, adding edge-line striping and crosswalk markings, and using the Illinois Highway repaving to add bike lanes by narrowing extra-wide lanes.
Traffic and speeding on Cardinal Drive
Neighbors and commissioners raised repeated concerns about speeders and cut-through traffic in Laraway Ridge once Cedar Pointe is built. The chairman suggested calling police for enforcement; a stop sign request would go through the Village Engineer.
2026 street resurfacing and Route 30 medians
About 5.5 miles of village streets get repaved this year for $2.66 million, and Route 30 gets landscaped medians plus a new left-turn lane into Providence Catholic High School.
Sunset Trail Culvert Failure
A 40-inch culvert under Sunset Trail is deteriorating, causing potholes — one within 10 feet of a building. The village is paying Bisping Construction $37,540 to replace it before it fails further.
Gougar Road I-80 Bridge Enhancements
Will County is rebuilding the I-80 bridge at Gougar Road, and New Lenox is paying up to $76,535 to add railings, staining, and village branding so the western gateway looks like New Lenox.