Civic Issues
Topics getting the most attention in New Lenox public meetings, ranked by how frequently they are discussed.
5 issues in water utilities with high priority
Northside Water Main Replacement – Phase 3
The village is borrowing from the state's low-interest loan program to replace old water mains on Gall Lane, Hawthorne Lane and Fir Street. Waiving the second read keeps the funding application moving.
State preemption of local authority over fiber companies
The village leased a small piece of the Joliet Highway pump station to Pavlov Media for its fiber hub — and in exchange, all village buildings get free fiber internet service.
Schoolhouse Road water tower
Bids came in at $8-10 million against a much lower estimate, so the village rejected them all and will rework scope and timing before rebidding.
Nelson Road stormwater drainage capacity
Residents say culverts under Nelson Road already can't handle heavy storms, flooding the road and threatening basements. The developer says a roughly 7-acre, 10-foot-deep pond and a 6-foot berm will manage runoff, with final details at final engineering.
IEPA loan for sewer expansion
The village took the first formal step to borrow from the Illinois EPA to build the next gravity sewer line from Haven and Nelson to the new water resource recovery facility. First read only — final vote comes later.