Civic Issues
Topics getting the most attention in Palatine public meetings, ranked by how frequently they are discussed.
8 issues in water utilities
Harper College Water System Improvements
The village and Harper College are partnering on a water main extension and new elevated storage tank on campus to boost water pressure, fire flows, and system reliability.
Sanitary Sewer Recapture Agreement on Lake Cook Road
An ordinance was passed to establish a sanitary sewer main extension recapture along Lake Cook Road, protecting current homeowners from paying unless they undertake major redevelopment.
Fiber Optic Network Expansion Along Hicks Road
The village is extending its fiber optic network along Hicks Road to connect the Kasuba lift station and improve municipal communication lines.
IT Infrastructure Overhaul
The village awarded an annual contract for replacing desktop computers and laptops to ensure staff have functional equipment.
2026 Drainage Improvements Project
The village awarded the annual drainage improvement contract to DeVinci Construction for $283,483 to upgrade public right-of-way drainage and support upcoming road maintenance.
Combined Services Facility Fuel System Replacement
The village is upgrading its 35-year-old fuel tanks, dispensers, and canopy at the Public Works campus. Design engineering services were awarded to Robinson Engineering, coordinating with police headquarters updates to achieve economies of scale.
Highland Meadow Subdivision Drainage and Sediment Concerns
A resident raised concerns regarding historical drainage coordination, sediment violations, and court-ordered flood control maintenance in the Highland Meadow subdivision.
ComEd Utility Pole Variance for Electrical Reliability
ComEd is installing new utility poles and capacitor banks on Illinois Avenue and South Vermont Street to improve local power delivery and grid reliability.