Civic Issues
Topics getting the most attention in Romeoville public meetings, ranked by how frequently they are discussed.
9 issues in roads
Pace transit draft plan feedback
Pace is seeking public input on its draft transit revision plan, with a survey on the village website and a virtual open house November 18. Mayor Noak urged residents to weigh in on where fixed-route service and access should go.
Bluff Road maintenance agreement with DuPage Township
Until the unincorporated three-quarter-mile stretch of Bluff Road is fully rebuilt, the Village will patch and re-shoulder it — and plow and salt it this winter. That means a smoother, safer drive for anyone using that corridor.
Route 53 Safety Improvements and Possible Signal at Alexander
The village keeps pushing IDOT on safety along Route 53. A new analysis will determine whether a long-sought traffic signal at Alexander Circle/Phelps Avenue is justified.
JJC Sidewalk Addition
The village is launching a new contract-based program where Safe Step LLC grinds down raised sidewalk edges more than an inch high. It's proactive, helps with funding, and keeps the village ADA-compliant across six maintenance zones.
2026 Street Maintenance and Repair Programs
The consent agenda funded the 2026 hot-mix asphalt, concrete repair, and subdivision resurfacing programs, plus MFT-funded street maintenance for the fiscal year.
Route 53 Cable Relocation and Corridor Improvements
The village is burying overhead power lines along Route 53 from Lewis University Parkway to Airport Road, with new lighting, landscaping, and a multi-use path extension to Taylor Road. It's the first phase of a long-planned overhaul of the main gateway into Romeoville, supported by state grant funding.
Lower Industrial resurfacing and utility improvements
The older Lower Industrial area gets road reconstruction on Greenwood up to Parkwood plus storm sewer fixes, building on the water main upgrades just completed there.
STP grant matching funds for five road projects
The village is committing its 20% local match to pursue federal grants covering 80% of costs for resurfacing Murphy Drive, Normantown, Belmont, Troxel, and 135th Street bridge decks. Romeoville has a strong track record of landing these grants.
Renwick Road Path Project design engineering
V3 Companies was hired (bid process waived) to design the Renwick Road Path, a shared-use path funded partly by a $3 million ITEP grant.