Civic Issues
Topics getting the most attention in Round Lake Beach public meetings, ranked by how frequently they are discussed.
4 issues in water utilities with medium priority
Lotus Water Tower Painting Project
A contract with Dynamic Industrial Services, Inc. was scheduled for the painting of the Lotus water tower. Water tower maintenance protects water quality and infrastructure longevity.
Winter Salt and De-icing Supplies
The Board ratified buying rock salt from Salt Xchange, stocking up for snow and ice removal this winter.
Sanitary Sewer Point Repairs
The Village televises 10 percent of its sewer system each year, and this year's findings drive a list of targeted repairs to keep groundwater from infiltrating the pipes.
Infrastructure Contracts: Sewer Repairs, Water Tower Painting, Sidewalks and Pavement Marking
The board approved a bundle of road and sidewalk work: crack sealing, HMA pavement patching, and sidewalk/curb repairs. These keep village streets in shape through the construction season.