Civic Issues
Topics getting the most attention in Shorewood public meetings, ranked by how frequently they are discussed.
4 issues in water utilities with high priority
Kipling Estates shared drain tile drainage problems
A resident at 1004 Conrad Lane says storm water backs into her basement because a shared drain tile serving five homes is backing up and no one — including the village — can locate where it runs. She's spent about $2,000 on plumbers and scoping and asked the village to help find a workable connection point before winter.
River Road Lift Station Expansion
Shorewood's Seil Road lift station handles about 65% of village wastewater and gets overwhelmed in heavy rains. This study is step one of an expansion that could divert flow and keep up with growth on the village's west side.
River Lift Station maintenance
Shorewood's Seil Road lift station handles about 65% of village wastewater and gets overwhelmed in heavy rains. This study is step one of an expansion that could divert flow and keep up with growth on the village's west side.
Western sewer and water expansion and future development
Shorewood is nearing its 4-million-gallon-per-day wastewater capacity limit with Joliet. Paying $130,000 now to reserve space in an upsized Rock Run sewer line avoids far costlier permitting later when the village needs more capacity.