Civic Issues
Topics getting the most attention in Washington public meetings, ranked by how frequently they are discussed.
18 issues in roads
Westgate Road Parking Safety
The city's narrowest major collector allows parking on both sides, creating visibility problems at a curve near a crosswalk to the park. Staff will notify residents and draft a one-side restriction.
Extending public transit to Cherry Tree and Freedom Parkway
The city is spending $37,500 on a study of the whole Freedom Parkway/Cummings Lane/Lakeshore Drive corridor after repeated complaints about wait times near Menards, Walmart, Kingsbury, and the Culver's entrance. The goal is to find fixes that address traffic flow across the area rather than one intersection.
Bondurant Street school-hours traffic rules codified
District 50 asked for a flashing beacon at the new School Street/Grant Street school crossing, and the council unanimously said yes — up to $50,000 — aiming to install it before winter.
Bondurant Street One-Way and Turn Restrictions
The council tabled its traffic calming policy discussion to the May committee of the whole, saying it needs more time to work through open questions.
Main Street bridge reconstruction closures
Masons replaced the arch keyway at damaged Candlewood Bridge and are working to keep the wing walls standing; a structural engineer will load-rate the bridge after repairs, and the council may eventually consider making it a pedestrian bridge.
Route 8 Street Lighting and Pedestrian Safety
Multiple pedestrian fatalities have occurred along Route 8, where sidewalk lighting is limited mostly to intersections. The committee directed staff to get pricing from Ameren and develop a lighting plan — especially near Washington Plaza/Sunnyland — with possible IDOT funding avenues limited to larger streetscape projects.
Shellbark and Pinetree Road Repairs
The 2022 'pressure paving' trial turned out too heavy for Shellbark's pavement and it's deteriorating, with Pinetree also rough. The council approved up to $235,000 for a double chip seal that fits the rural road cross-section.
Stop Signs at Herman Essig Drive & Culver's Driveway
The Culver's entrance/exit near Washington Road had no stop or yield signage despite a complex multi-access intersection — Alderperson Moss called it out after his own near miss. Signs are coming after the council waived second reading.
Roundabout Consideration at Dallas & Krueger Road
Alderperson Smith raised the idea of a roundabout at the congested Dallas and Krueger intersection; staff noted right-of-way would be needed and the topic was referred for staff discussion.
Truck Traffic on Zinzer Place
Semi-trucks are bypassing the railroad bridge by cutting through Zinzer Street, damaging yards and crossing grass. The fix under consideration: cheap signage steering trucks to Jefferson and Main instead.
FY27 Regional Transportation Funding
Washington's annual PPUATS match rises slightly to $9,096.86 — required to stay eligible for federal transportation dollars the city can tap for local road projects.
North Main Street resurfacing grant application
The city wants to apply for federal Surface Transportation Block Grant money to resurface North Main Street between Devonshire and the TP&W tracks, with a 20% local match. Applications are due May 29 and a resolution goes to council next week.
Elgin Avenue sidewalk gap closed for school-route safety
A missing stretch of sidewalk between Bobalink and Grandville — a route kids use to get to school — will be filled by C&G of East Peoria for $70,776.
Candlewood Bridge restoration ongoing
The historic bridge is coming along — arches are stabilized, masonry tuck-pointing continues, and officials say the scary early cost risks have receded, though underdrain and headwall work remains.
Constitution Street parking congestion
Goodwill employees parking on Constitution Street to save lot spaces for customers has created safety and traffic headaches near Cummings Lane. Interim no-parking zones are proposed, with signs and monitoring to follow.
Freedom Parkway/Walmart/Menards traffic safety
Left turns out of the Walmart/Menards entrances are widely seen as dangerous, and alderpersons also flagged congestion at Cherry Tree/Culvers and Cummings Lane. A $22,000 Terra Engineering study will sort out whether a signal, roundabout, or new geometry is warranted.
Catherine Street Phase Three Bid Comes in Low
Phase 3 of the Catherine Street rebuild goes to Start Excavating at $1.51 million. Residents on that corridor get a fully reconstructed street.
2026 Street Maintenance Program (MFT Funds)
The yearly IDOT resolution lets the city spend motor fuel tax dollars on street maintenance, with about $1 million set aside for the 2026 program. This is the first step in the annual process before the Candlewood Bridge work.