Lilija V. Stevens
No biography on file yet.
Voice
- Meetings spoken in
- 4
- Total speaking time
- 0:09
- Avg per meeting
- 0:02
- Segments
- 10
Want every word Stevens has said?
The OpenCity MCP for Claude.ai answers questions like “what has Stevens said about housing this year” with one prompt — full speaking history, with YouTube timestamps.
Top issues during term (18)(Roads)
Bondurant Street school-hours traffic rules codified
Up to $50,000 for the beacon (the last comparable unit cost about $45,000).
Extending public transit to Cherry Tree and Freedom Parkway
$37,500 for the expanded study, up from the original $22,000 proposal.
Westgate Road Parking Safety
Minimal cost beyond signage and notification; a full road widening would be expensive.
Main Street bridge reconstruction closures
Up to $547,465 for engineering design services.
Bondurant Street One-Way and Turn Restrictions
Route 8 Street Lighting and Pedestrian Safety
Costs not yet known — installation and monthly Ameren service fees are expected, with possible transformer costs if none exist nearby.
Truck Traffic on Zinzer Place
The signage approach is described as a low-cost first step before costlier intersection redesign.
Stop Signs at Herman Essig Drive & Culver's Driveway
Shellbark and Pinetree Road Repairs
Up to $235,000 from the roadway maintenance budget.
Roundabout Consideration at Dallas & Krueger Road
FY27 Regional Transportation Funding
The city's contribution rises about $155, to $9,096.86, from its motor fuel tax funds.
Freedom Parkway/Walmart/Menards traffic safety
$22,000 for the study; a signalized intersection could cost roughly half a million dollars if warranted.
Constitution Street parking congestion
Minor cost for signage on an interim restriction.
Elgin Avenue sidewalk gap closed for school-route safety
$70,776 for the sidewalk construction, within the budgeted amount though above the engineer's estimate.
Candlewood Bridge restoration ongoing
Remaining work includes underdrain tie-in and possible headwall repairs, with pay request #2 approved on the consent agenda.
2026 Street Maintenance Program (MFT Funds)
About $1 million of motor fuel tax money committed to 2026 street maintenance.
Catherine Street Phase Three Bid Comes in Low
$1,510,944.60 from city road project funds.
North Main Street resurfacing grant application
The city would commit a 20% local match for the federally funded resurfacing project.
Decisions during term (0)
Recorded while Stevens was in office — not necessarily decisions they moved, spoke to, or voted on.
No decisions found matching Roads.