Civic Issues

Topics getting the most attention in Frankfort public meetings, ranked by how frequently they are discussed.

Filtered to Water Utilities

8 issues in water utilities

HighWater Utilities

ComEd power outages in Connecticut Hills and Tanglewood

Trustees have been pushing ComEd on repeated power outages in the Connecticut Hills and Tanglewood neighborhoods. ComEd acknowledged the problem and has grid improvements slated for 2027, and is encouraging residents to report problem trees near power lines before they cause outages.

3 mentions (2 this month)Last discussed Nov 2, 2026
LowWater Utilities

Water connection and pre-annexation on Ironwood Drive

A property owner will build a single-family home on vacant Ironwood Drive and connect to village water under a pre-annexation agreement, since full annexation isn't possible for non-contiguous land.

Last discussed Oct 19, 2026
MediumWater Utilities

Regional wastewater plant filter capacity

Engineers found a hydraulic bottleneck limiting the regional wastewater treatment plant's tertiary filters. A $66,600 study will figure out how to fix it before capacity problems grow.

2 mentionsLast discussed Oct 5, 2026
MediumWater Utilities

Sanitary sewer maintenance contracts

Two contracts totaling about $446,000 will clean, televise, and rehab 154 manholes to keep storm water from overloading the sewer system.

2 mentionsLast discussed Aug 17, 2026
MediumWater Utilities

2026 Water Main Replacement in Prestwick

Aging water mains on St. Andrews Way and Glenbarr Lane will be replaced under a $1.01 million contract with Iroquois Paving, improving reliability and water quality in the Prestwick subdivision.

1 mentionLast discussed Jun 15, 2026
MediumWater Utilities

Well #4 Water Treatment Plant Upgrades

The 2002-era Well #4 iron removal plant in Tanglewood needs major upgrades; Robinson Engineering will handle the design work for $170,000. Trustee Rigoni abstained because she works part-time for Robinson.

1 mentionLast discussed Jun 15, 2026
HighWater Utilities

Resident drainage complaint on Harlem Avenue

Jerry Warning says a long-running natural water drainage problem is harming his property and that village staff haven't responded to his calls. He asked the board directly for help, threatening legal action.

1 mentionLast discussed May 4, 2026
MediumWater Utilities

Water system risk and emergency plan update

Federal law requires the village to refresh its water system risk assessment and emergency response plan every five years. The board signed off on $19,690 for HR Green to do the 2026 update.

1 mentionLast discussed Feb 2, 2026