Wastewater Treatment Plant UV Disinfection Conversion

The 45-year-old sludge building has only about five years of life left, so the village is accelerating $1.6 million in engineering now. A $1.87 million UV disinfection project was also moved up to save mobilization costs and reduce chlorine storage.

3 mentions (1 this month)Last discussed Nov 12, 2026
MediumWater Utilities

Jacobson Avenue retention pond problems

Residents in Trustee Siddiqi's district have complained about retention ponds; he's arranging a meeting between them and public works to find a fix.

1 mentionLast discussed Oct 15, 2026
MediumWater Utilities

New water billing portal

The finance department announced a new online portal for paying water bills, viewing usage and payment history, coming soon.

4 mentionsLast discussed Oct 15, 2026
HighWater Utilities

CDBG Jill Court and Maryland Avenue Water Main Replacement

The village is replacing aging water mains at $1.3 million a year but the master plan says $1.74 million is needed. The fee on your water bill funds this — and increases planned through 2028 may need to continue beyond that.

3 mentionsLast discussed Jul 16, 2026
HighWater Utilities

Wastewater Treatment Plant Investment

State EPA nutrient-removal mandates will require major plant expansion, with some buildings dating to 1959, funded through low-interest loans, rates and grants.

3 mentionsLast discussed Jun 18, 2026
MediumWater Utilities

Residential service line warranties

Aging water and sewer lines in Glendale Heights neighborhoods — some 25 to 60 years old — fail frequently, with replacements costing $10,000-$12,000 or more. The proposed HomeServe program gives residents a voluntary, village-endorsed way to insure against those costs, though the village only markets it rather than running it.

2 mentionsLast discussed Jun 4, 2026
MediumWater Utilities

North Avenue sanitary sewer rehabilitation

The village locked in contracts for engineering and construction on a major sewer rehab project under North Avenue.

1 mentionLast discussed May 7, 2026
HighWater Utilities

Highland Avenue water main and road reconstruction

Contracts were approved for engineering and construction on the Highland Avenue reconstruction and water main replacement project.

1 mentionLast discussed Apr 2, 2026
HighWater Utilities

Emergency Well Set-Back Zones

The village wants up to 1,000-foot buffer zones around its wells to keep construction from contaminating drinking water. The wells serve as backup if the DuPage Water Commission supply is lost.

1 mentionLast discussed Mar 26, 2026
MediumWater Utilities

Glen Ellyn Road flooding and drainage

Flooding along Glen Ellyn Road in unincorporated areas, water flow problems, and catch basin issues were raised. These drainage problems can affect nearby properties and streets.

1 mentionLast discussed Mar 25, 2026
MediumWater Utilities

Delinquent water service procedures

Residents can currently run 55 days past their bill date before water shutoff is possible. Shortening that to about 30 days would trigger earlier outreach — payment plans and assistance programs — before balances hit $500–$600.

2 mentionsLast discussed Mar 5, 2026
HighWater Utilities

Well No. 12 repair and rehabilitation

The village is repairing and rehabilitating one of its water wells, using a bid waiver to hire Lane Christianson Company directly. This keeps a key piece of water infrastructure running for residents.