Civic Issues
Topics getting the most attention in Grundy County public meetings, ranked by how frequently they are discussed.
10 issues in zoning
Setback Variance Request for Single-Family Home on US Route 6
A Morris homeowner wants to build a two-story house next to an existing garage, but that forces the house 5 feet closer to the east property line than the zoning code allows. The board found the hardship real, not self-created, and no neighbors opposed. Because of a new county rule, the final call moves to the Land Use Committee and County Board.
UDO Text Amendment 26-ZBA-007 (development code overhaul)
After 16 years, the county's development rules are modernized — digital submittals, clearer permit processes, and flowcharts to guide builders through approvals.
Livestock setback variance for horse barn on narrow lot
A landowner wanted to keep horses on a three-acre lot too narrow for the county's 100-foot livestock setback. The board agreed the L-shaped parcel left no compliant building spot and granted the variance, letting roughly three horses be housed about 40 feet from the property line.
Conversion of former church to climate-controlled self-storage
Storage-facility owners Sean and Heather Egglin converted their vacant former church building into climate-controlled storage in 2024 but needed the special use permit formally updated to get final occupancy and close out their bank loan. The board granted the modification with four extra conditions.
UDO text amendment cleanup
A months-long rewrite of several sections of the county's Unified Development Ordinance came back to the board after the county board caught grammatical errors in September. With content unchanged, the board again recommended it forward.
Commercial solar development in Grundy County
Two large solar projects got their special use permits extended a year, through March 2027, so permitting and construction can wrap up. The developer has signed grid agreements with ComEd, closed financing, and expects to start building in spring 2026.
Battery energy storage systems (BESS) ordinance
State law forced the county to adopt a battery storage ordinance by October 2026 or lose local control. The county's version requires its own permits for every facility, strict fire safety rules, decommissioning plans and ethical sourcing certification.
SalClay Truck & Trailer Repair Access Variance
A new truck and trailer repair and IDOT inspection facility at 4020 W. Dupont Road needs a variance from the county's 1,000-foot corner clearance rule to keep its driveway off fast-moving Dupont Road rather than narrow Verona Road. Farmers, truckers, and school districts say they depend on the business, but the committee wants proof of hardship — core samples and real cost figures for Verona Road — before setting a precedent. It comes back September 17.
First comprehensive update to county development code since 2010
The county's new comprehensive plan finished its public engagement phase with about 2,500 people participating, and municipal alignment meetings come in mid-March. Meanwhile, staff wants to adopt the 2024 building codes, which would make Grundy County among the first in the area.
Setback variance and floodplain development at 7645 Old Stage Road
A property owner wanted to build a pole barn 10 feet from the road on a parcel that's mostly FEMA floodplain. The county said no because of sight-line risks on a busy road, flood hazards, and the cost if emergency crews ever have to respond there.