Top issues during term (9)(Roads)
Neighborhood traffic and pedestrian safety study
Up to $35,000, well within the $90,000 budgeted for the study program.
Third Street and County Line Road crosswalk
Road and downtown striping program
$31,559.40 — $18,000 within the $20,000 annual striping budget plus about $12,000 from the KLOA CBD improvements budget.
BNSF track construction and crossing closures
2026 road resurfacing program
About $83,000 under the $1.5 million budget.
Four-way stop at Ayres and Lincoln
No cost mentioned beyond sign installation; a follow-up traffic count is planned in a year.
2026 sidewalk and 2027 resurfacing programs
$141,000 for sidewalk construction and $123,160 for 2027 resurfacing design.
Sixth Street federal grant secured
About $1.92 million in federal money coming in to offset local costs.
Two-way stop at Oak and First
Minimal — signage change only.