Greg Hart
No biography on file yet.
Voice
- Meetings spoken in
- 18
- Total speaking time
- 2:47:36
- Avg per meeting
- 9:19
- Segments
- 3070
Want every word Hart has said?
The OpenCity MCP for Claude.ai answers questions like “what has Hart said about housing this year” with one prompt — full speaking history, with YouTube timestamps.
Top issues during term (20)
2026 Property Tax Levy and Bond Abatements
Net levy of $13,943,594 for 2026, with roughly $369,000 more in property taxes than 2026 driven mostly by pension contributions.
Water system reliability: Well #5 repair, Well #10 retirement
$38,310 added to the water system maintenance account, on top of the existing $32,000 purchase order.
Campaign-contribution dispute stalls engineering contract
The contract is worth up to $138,000 for 2027–2028 development reviews, with costs passed to permit applicants.
Historic Preservation — Property List Additions and 408 S. Washington Incentive
A $10,000 grant and an estimated $7,500 in five-year property tax savings for the Washington Street property.
Burlington Park Pavilion update
No cost to taxpayers — up to $275,000 in donations from the hospital and Chamber, with a third donor (Hinsdale Bank & Trust) to come.
St. Isaac Jogues School Playground
$194,175.69, already set aside in the 2026 capital budget, so no new taxes.
2026 Sanitary Sewer Rehabilitation and Lining
$57,043.55 awarded, capped at $80,000 budgeted.
Refuse hauler transition to Flood Brothers
Saves residents roughly 2% over the current hauler's pricing across the three-year contract.
Robins Park Treehouse Playground opens
Total project cost of about $329,967, under the $380,000 estimate, with much of it covered by the Mather donation.
South Garfield Street drainage study
Study costs $34,450, within the 2025 MIP engineering studies budget.
Neighborhood traffic and pedestrian safety study
Up to $35,000, well within the $90,000 budgeted for the study program.
Lead service line replacement policy and funding
About $660,000 in 2027 for the first of ten required years of replacements.
Children's Activity Pool replacement
About $1.22 million, slightly over the preliminary estimate; grants and supplemental funds will be discussed after bidding.
Ethics and transparency reforms
Hart is donating vendor-related campaign contributions to four local nonprofits; the dollar total wasn't stated.
2027 Village Budget Introduction
About $25.2 million in planned general fund spending for 2027, with reserves held above the 25% target.
Fire chief transition: Matt Daly appointed
The part-time extension costs about $12,000, paid out as the truck build hits milestones.
Dietz Park Playground Replacement
Total project cost about $330,000 — under the $380,000 estimate, thanks to village funds and the Mather donation.
Third Street and County Line Road crosswalk
Road and downtown striping program
$31,559.40 — $18,000 within the $20,000 annual striping budget plus about $12,000 from the KLOA CBD improvements budget.
Commercial drone delivery regulation
Decisions during term (131)
Recorded while Hart was in office — not necessarily decisions they moved, spoke to, or voted on.