Top issues during term (20)

high↑Oct 2026[35]

2026 Property Tax Levy and Bond Abatements

Net levy of $13,943,594 for 2026, with roughly $369,000 more in property taxes than 2026 driven mostly by pension contributions.

high→Mar 2026[34]

Water system reliability: Well #5 repair, Well #10 retirement

$38,310 added to the water system maintenance account, on top of the existing $32,000 purchase order.

high↑Oct 2026[28]

Campaign-contribution dispute stalls engineering contract

The contract is worth up to $138,000 for 2027–2028 development reviews, with costs passed to permit applicants.

medium↑Mar 2026[27]

Historic Preservation — Property List Additions and 408 S. Washington Incentive

A $10,000 grant and an estimated $7,500 in five-year property tax savings for the Washington Street property.

high→Mar 2026[26]

Burlington Park Pavilion update

No cost to taxpayers — up to $275,000 in donations from the hospital and Chamber, with a third donor (Hinsdale Bank & Trust) to come.

medium↑Jan 2026[26]

St. Isaac Jogues School Playground

$194,175.69, already set aside in the 2026 capital budget, so no new taxes.

medium→Aug 2026[20]

2026 Sanitary Sewer Rehabilitation and Lining

$57,043.55 awarded, capped at $80,000 budgeted.

high↓May 2026[18]

Refuse hauler transition to Flood Brothers

Saves residents roughly 2% over the current hauler's pricing across the three-year contract.

medium↑Mar 2026[16]

Robins Park Treehouse Playground opens

Total project cost of about $329,967, under the $380,000 estimate, with much of it covered by the Mather donation.

medium↑Oct 2026[15]

South Garfield Street drainage study

Study costs $34,450, within the 2025 MIP engineering studies budget.

high↓Feb 2026[15]

Neighborhood traffic and pedestrian safety study

Up to $35,000, well within the $90,000 budgeted for the study program.

high↑May 2026[13]

Lead service line replacement policy and funding

About $660,000 in 2027 for the first of ten required years of replacements.

medium↓Apr 2026[11]

Children's Activity Pool replacement

About $1.22 million, slightly over the preliminary estimate; grants and supplemental funds will be discussed after bidding.

high↑Nov 2026[10]

Ethics and transparency reforms

Hart is donating vendor-related campaign contributions to four local nonprofits; the dollar total wasn't stated.

critical↑Nov 2026[10]

2027 Village Budget Introduction

About $25.2 million in planned general fund spending for 2027, with reserves held above the 25% target.

high↑Oct 2026[10]

Fire chief transition: Matt Daly appointed

The part-time extension costs about $12,000, paid out as the truck build hits milestones.

medium↓Mar 2026[6]

Dietz Park Playground Replacement

Total project cost about $330,000 — under the $380,000 estimate, thanks to village funds and the Mather donation.

medium↓Aug 2026[6]

Third Street and County Line Road crosswalk

low↓Sep 2026[5]

Road and downtown striping program

$31,559.40 — $18,000 within the $20,000 annual striping budget plus about $12,000 from the KLOA CBD improvements budget.

low↓Aug 2026[5]

Commercial drone delivery regulation

Decisions during term (131)

Recorded while Hart was in office — not necessarily decisions they moved, spoke to, or voted on.

approved6-0Nov 17, 2026

Approval of Minutes — November 2, 2026 Regular Meeting

approved6-0Nov 17, 2026

Consent — Payment of Accounts Payable ($4,217,521.40)

approved6-0Nov 17, 2026

Consent — Property Disposal Ordinance, Sewer Bid #1744, and Preservation Incentive for 408 S. Washington Street

approved6-0-1Nov 17, 2026

Historically Significant Structures Property List — Eight Additions

approved6-0Nov 17, 2026

2026 Property Tax Levy and Five Bond Abatement Resolutions

approved6-0Nov 17, 2026

St. Isaac Jogues Playground — Planned Development Adjustment Approved

approved6-0Nov 17, 2026

APPROVAL OF MINUTES

approved6-0Nov 17, 2026

Approve an Ordinance Levying Taxes for Corporate Purposes for the Fiscal Year of the Village of Hinsdale, Illinois commencing on January 1, 2026 and Ending on December 31, 2026 in the aggregate amount of $16,868,734. (First Reading –…

approved6-0Nov 17, 2026

Approve a Resolution abating the tax hereto levied for the year 2026 to pay the principal of and interest on $2,025,000 General Obligation Bonds (Waterworks and Sewerage System Alternate Revenue Source), Series 2014A, of the Village of…

approved6-0Nov 17, 2026

Approve a Resolution abating the tax hereto levied for the year 2026 to pay the principal of and interest on $5,000,000 General Obligation Bonds (Alternate Revenue Source), Series 2014B, of the Village of Hinsdale, DuPage and Cook…

approved6-0Nov 17, 2026

Approve a Resolution abating the tax hereto levied for the year 2026 to pay the principal of and interest on $9,775,000 General Obligation Bonds (Alternate Revenue Source), Series 2017A, of the Village of Hinsdale, DuPage and Cook…

approved6-0Nov 17, 2026

Approve a Resolution abating the tax hereto levied for the year 2026 to pay the principal of and interest on $20,000,000 General Obligation Bonds (Alternate Revenue Source), Series 2018A, of the Village of Hinsdale, DuPage and Cook…

approved6-0Nov 17, 2026

Approve a Resolution abating the tax hereto levied for the year 2026 to pay the principal of and interest on $2,655,000 General Obligation Bonds (Alternate Revenue Source), Series 2021, of the Village of Hinsdale, DuPage and Cook Counties,…

approved6-0Nov 17, 2026

ADJOURNMENT

approved6-0Nov 2, 2026

Approval of minutes of the regular meeting of October 20, 2026

approved6-0Nov 2, 2026

Accounts payable, October 21 – November 2, 2026 (consent agenda)

approved6-0Oct 20, 2026

Approval of minutes of October 6, 2026 regular meeting

approved6-0Oct 20, 2026

Accounts payable Warrant #1846 ($1,719,757.07)

tabledOct 20, 2026

CBBEL two-year contract extension for development reviews ($138,000) — pulled from agenda

approved6-0Oct 20, 2026

Consent items 7.c–7.e: HR Green drainage study, Layne Christensen well work, Bid #1741 rejection