Top issues during term (20)
2026 Property Tax Levy and Bond Abatements
Net levy of $13,943,594 for 2026, with roughly $369,000 more in property taxes than 2026 driven mostly by pension contributions.
Water system reliability: Well #5 repair, Well #10 retirement
$38,310 added to the water system maintenance account, on top of the existing $32,000 purchase order.
Campaign-contribution dispute stalls engineering contract
The contract is worth up to $138,000 for 2027–2028 development reviews, with costs passed to permit applicants.
Historic Preservation — Property List Additions and 408 S. Washington Incentive
A $10,000 grant and an estimated $7,500 in five-year property tax savings for the Washington Street property.
Burlington Park Pavilion update
No cost to taxpayers — up to $275,000 in donations from the hospital and Chamber, with a third donor (Hinsdale Bank & Trust) to come.
St. Isaac Jogues School Playground
$194,175.69, already set aside in the 2026 capital budget, so no new taxes.
2026 Sanitary Sewer Rehabilitation and Lining
$57,043.55 awarded, capped at $80,000 budgeted.
Refuse hauler transition to Flood Brothers
Saves residents roughly 2% over the current hauler's pricing across the three-year contract.
Robins Park Treehouse Playground opens
Total project cost of about $329,967, under the $380,000 estimate, with much of it covered by the Mather donation.
South Garfield Street drainage study
Study costs $34,450, within the 2025 MIP engineering studies budget.
Neighborhood traffic and pedestrian safety study
Up to $35,000, well within the $90,000 budgeted for the study program.
Lead service line replacement policy and funding
About $660,000 in 2027 for the first of ten required years of replacements.
Children's Activity Pool replacement
About $1.22 million, slightly over the preliminary estimate; grants and supplemental funds will be discussed after bidding.
Ethics and transparency reforms
Hart is donating vendor-related campaign contributions to four local nonprofits; the dollar total wasn't stated.
2027 Village Budget Introduction
About $25.2 million in planned general fund spending for 2027, with reserves held above the 25% target.
Fire chief transition: Matt Daly appointed
The part-time extension costs about $12,000, paid out as the truck build hits milestones.
Dietz Park Playground Replacement
Total project cost about $330,000 — under the $380,000 estimate, thanks to village funds and the Mather donation.
Third Street and County Line Road crosswalk
Road and downtown striping program
$31,559.40 — $18,000 within the $20,000 annual striping budget plus about $12,000 from the KLOA CBD improvements budget.
Commercial drone delivery regulation
Decisions during term (131)
Recorded while Byrnes was in office — not necessarily decisions they moved, spoke to, or voted on.
Approval of Minutes — November 2, 2026 Regular Meeting
Consent — Payment of Accounts Payable ($4,217,521.40)
Consent — Property Disposal Ordinance, Sewer Bid #1744, and Preservation Incentive for 408 S. Washington Street
Historically Significant Structures Property List — Eight Additions
2026 Property Tax Levy and Five Bond Abatement Resolutions
St. Isaac Jogues Playground — Planned Development Adjustment Approved
APPROVAL OF MINUTES
Approve an Ordinance Levying Taxes for Corporate Purposes for the Fiscal Year of the Village of Hinsdale, Illinois commencing on January 1, 2026 and Ending on December 31, 2026 in the aggregate amount of $16,868,734. (First Reading –…
Approve a Resolution abating the tax hereto levied for the year 2026 to pay the principal of and interest on $2,025,000 General Obligation Bonds (Waterworks and Sewerage System Alternate Revenue Source), Series 2014A, of the Village of…
Approve a Resolution abating the tax hereto levied for the year 2026 to pay the principal of and interest on $5,000,000 General Obligation Bonds (Alternate Revenue Source), Series 2014B, of the Village of Hinsdale, DuPage and Cook…
Approve a Resolution abating the tax hereto levied for the year 2026 to pay the principal of and interest on $9,775,000 General Obligation Bonds (Alternate Revenue Source), Series 2017A, of the Village of Hinsdale, DuPage and Cook…
Approve a Resolution abating the tax hereto levied for the year 2026 to pay the principal of and interest on $20,000,000 General Obligation Bonds (Alternate Revenue Source), Series 2018A, of the Village of Hinsdale, DuPage and Cook…
Approve a Resolution abating the tax hereto levied for the year 2026 to pay the principal of and interest on $2,655,000 General Obligation Bonds (Alternate Revenue Source), Series 2021, of the Village of Hinsdale, DuPage and Cook Counties,…
ADJOURNMENT
Approval of minutes of the regular meeting of October 20, 2026
Accounts payable, October 21 – November 2, 2026 (consent agenda)
Approval of minutes of October 6, 2026 regular meeting
Accounts payable Warrant #1846 ($1,719,757.07)
CBBEL two-year contract extension for development reviews ($138,000) — pulled from agenda
Consent items 7.c–7.e: HR Green drainage study, Layne Christensen well work, Bid #1741 rejection
Voting record (182)
Oldest to newest — hover a bar for the item.
Approval of Minutes — November 2, 2026 Regular Meeting
Consent — Payment of Accounts Payable ($4,217,521.40)
Consent — Property Disposal Ordinance, Sewer Bid #1744, and Preservation Incentive for 408 S. Washington Street
Historically Significant Structures Property List — Eight Additions
2026 Property Tax Levy and Five Bond Abatement Resolutions
St. Isaac Jogues Playground — Planned Development Adjustment Approved
Approval of minutes of the regular meeting of October 20, 2026
Accounts payable, October 21 – November 2, 2026 (consent agenda)
Approval of minutes of the regular meeting of September 15, 2026
Payment of accounts payable ($1,293,892.26)
Consent agenda items 7b–7d (liquor licenses, deicing salt, pressure valves)
Approve payment of the accounts payable for the period of September 16, 2026 through October 6, 2026 in the aggregate amount of $1,293,892.26 as set forth on the list provided by the Village Treasurer
Approve consent agenda items 7b – 7d as presented
approve the minutes of the regular meeting of September 15, 2026, as presented
Dietz Park playground replacement
Authorize staff to purchase the equipment and approve the installation of a new playground at Dietz Park through Playcore Wisconsin, Inc. d/b/a GameTime, and GameTime c/o Cunningham Recreation of Char
adjourn the meeting into closed session under 5 ILCS 120/2(c)(1) appointment, employment compensation, discipline, performance or dismissal of specific employees or legal counsel, not to reconvene int
approve the minutes of the regular meeting of September 1, 2026, as amended
adjourn the meeting
Waive first reading and approve an emergency purchase to Orbis Solutions, Inc. of Aurora, IL, to replace the Village’s Storage Area Network (SAN) equipment in an amount not to exceed $48,450.24
Approve payment of the accounts payable for the period of September 2, 2026 through September 15, 2026 in the aggregate amount of $1,519,199.88 as set forth on the list provided by the Village Treasur
Waive first reading and approve payment to Precision Pavement Markings, Inc. Pingree Grove, IL for striping of Village roads and Central Business District in the amount of $31,559.40
Approval of minutes of the September 1, 2026 regular meeting, as amended
Consent agenda: accounts payable, September 2–15, 2026 ($1,519,199.88)
Emergency purchase: Orbis Solutions storage area network replacement, $48,450.24
Payment to Precision Pavement Markings, Inc. for road and CBD striping, $31,559.40
Approval of August 24, 2026 minutes
Accounts payable, Aug. 25 – Sept. 1, 2026
Approve payment of the accounts payable for the period of August 25, 2026 through September 1, 2026 in the aggregate amount of $282,911.30 as set forth on the list provided by the Village Treasurer, o
Adopt a Policy Regarding Lead Service Line Replacements on Village Projects that includes a cost sharing model that defines the Village’s financial responsibility for payment of 100% of the cost of re
adjourn the meeting
Approve consent agenda items 7b-7d
approve the minutes of the Committee of the Whole meeting of August 24, 2026, and the minutes of the special meeting of August 24, 2026, as amended
Approve an ordinance authorizing an amendment to the Fiscal Year 2026 Village of Hinsdale Budget (January 1, 2026 – December 31, 2026)
Approve entering into a contract with Stuckey Construction Company of Waukegan, IL for the replacement of the Children’s Activity Pool at the Hinsdale Community Pool at 500 W. Hinsdale Avenue, includi
Award a Design/Build contract to Burke, LLC., Rosemont, IL in the Guaranteed Maximum Price (GMP) amount of $499,599 for the 2026 Sanitary Sewer Rehabilitation and Lining Project
Approve an Ordinance Approving a Fifth Major Adjustment to a Planned Development – Hinsdale Meadows (Southeast Corner of 55th Street and County Line Road) – Hinsdale Meadows Homeowners Association
Consent agenda items 7b–7d
Children's Activity Pool replacement contract
FY2026 budget amendment for Burlington Park pavilion
2026 Sanitary Sewer Rehabilitation and Lining contract
Lead service line replacement policy
Hinsdale Meadows planned development — fifth major adjustment
Award a professional services contract to KLOA, Inc. of Rosemont, IL, for the second Neighborhood Traffic and Pedestrian Safety Study in the amount not to exceed $65,500
Approve payment of the accounts payable for the period of July 22, 2026 through August 24, 2026 in the aggregate amount of $2,487,862.82 as set forth on the list provided by the Village Treasurer, of
Approval of July 21, 2026 meeting minutes
Burlington Park Pavilion construction contract (8.a)
Concerned about cost exposure and the lack of firm language that no village funds will be used.