Civic Issues
Topics getting the most attention in Lake County public meetings, ranked by how frequently they are discussed.
11 issues in roads with medium priority
Regional paratransit — future of Ride Lake County
The RTA becomes the Northern Illinois Transit Authority September 1; riders need do nothing, but a quarter-percent regional sales tax increase starts August 1, funding $60 million in safety improvements and expanded fare discounts.
Route 120 corridor study public meeting
IDOT is studying the Route 120 corridor from west of Grays Lake to the Gurnee area, including possible bypass alternatives. An open house is Tuesday, November 10, 3–7 p.m. at the University Center of Lake County in Grays Lake; details at il120study.com.
Fairfield Road culvert replacement right-of-way
The county will spend $200,000 buying land to replace an undersized culvert that has caused historic upstream flooding, working with the Stormwater Management Commission, with a goal of bidding next year.
River and Roberts Roads roundabout safety redesign
The county is hiring Civiltech Engineering to design intersection improvements at Darrell and Roberts Roads — most likely a single-lane roundabout — with new trail connections to the Fox River Forest Preserve.
Envision 2050 long-range transportation plan
The county's 25-year transportation plan is entering its decision phase, modeling up to 75 future projects including roads, transit, and bike/pedestrian connections. Residents will get to weigh in through four public meetings, an online budgeting tool, and a student sign-design contest, with adoption expected spring 2027.
Hainesville Road improvements
The board approved a $1.76 million engineering contract plus $2.1 million in sales tax funds, along with agreements with Round Lake Beach, Round Lake Park, and Avon Township, to improve Hainesville Road from Washington Street to Rollins Road with sidewalks and multi-use paths.
Engineer recruitment and retention challenges
The Division of Transportation has five civil engineering positions vacant for about six months and is rethinking recruitment — including in-person career fairs — to compete for scarce graduates.
Right-of-way acquisitions for future road widenings
Money was set aside to buy land — by agreement or condemnation if needed — for future improvements to Rollins Road ($600,000), Fairfield Road ($350,000) and Buffalo Grove Road ($300,000), all targeted around 2029.
Winter road salt funding
The county is locking in $2 million of Motor Fuel Tax money for ice control salt ahead of the 2026-27 winter season.
Mundelein property conveyance to IDOT
A plan to transfer land from the state transportation department to Natural Resources and eventually the Forest Preserve is still on track — it's just moving at the pace of state government, not derailed as feared.
Martin Luther King Jr. Drive resurfacing
The county is resurfacing MLK Jr. Drive from Route 131 to Commonwealth Avenue with a $2.24 million construction contract plus $286,914 in engineering services. Smoother pavement should mean better rides for daily commuters.