Civic Issues
Topics getting the most attention in Lake County public meetings, ranked by how frequently they are discussed.
27 issues in roads
2026-2031 Transportation Improvement Program and major road contracts
Several road projects moved forward, including resurfacing 2.05 miles of Fairfield Road, concrete patching countywide, Bonner Road engineering, culvert replacements, and Hunt Club/Stearns School Road right-of-way — all funded largely by motor fuel tax dollars.
Route 120 corridor study public meeting
IDOT is studying the Route 120 corridor from west of Grays Lake to the Gurnee area, including possible bypass alternatives. An open house is Tuesday, November 10, 3–7 p.m. at the University Center of Lake County in Grays Lake; details at il120study.com.
Regional paratransit — future of Ride Lake County
The RTA becomes the Northern Illinois Transit Authority September 1; riders need do nothing, but a quarter-percent regional sales tax increase starts August 1, funding $60 million in safety improvements and expanded fare discounts.
DOT project transparency and construction software
Board Chair Hart suggested 'Rebuild Waukegan'-style signs so residents know when Lake County — not the state or village — is improving their roads; members agreed to pursue a slogan and possibly fund it.
Deerfield Road Improvement Project
More than $1.8 million moved for road improvements: an extra $1 million for buying right-of-way on Deerfield Road, and up to $370,094 (plus $445,000 in matching funds) for engineering the MLK Drive rebuild.
Hainesville Road widening and trail connections
The county is rebuilding Hainesville Road between Washington Street and Rollins Road with a new sidewalk and bike path, splitting costs with Round Lake Beach, Round Lake Park and Avon Township. Construction could start as early as 2027. Four separate local governments plus a golf course district had to coordinate to make it happen.
Old McHenry Road right-of-way funding
Lake County put $7.6 million toward buying land for the Old McHenry Road underpass in the Hawthorn Woods/Lake Zurich area, where 30,000 cars a day wait for 20 freight trains — including emergency responders stuck at the crossing. Construction targeting is 2029.
Washington Street / Hunt Club Road intersection concerns
Residents Dr. Michael Oster and Pat Kuebker raised flooding, congestion and safety concerns at the recently widened Washington Street/Hunt Club intersection in Gurnee, including a proposed 500-unit apartment development nearby; a board member detailed two years of county staff efforts to assist.
Fairfield Road resurfacing
Fairfield Road gets a $2 million resurfacing, plus concrete patching, culvert engineering, and traffic signal upgrades across county highways.
Fairfield Road culvert replacement right-of-way
The county will spend $200,000 buying land to replace an undersized culvert that has caused historic upstream flooding, working with the Stormwater Management Commission, with a goal of bidding next year.
Cedar Lake Road realignment right-of-way
The county is moving to buy land — possibly via condemnation — for a $70 million realignment of Cedar Lake Road past the Round Lake Metra station. Seven properties will be displaced and a $19 million federal grant must be obligated by September 2028.
Cedar Lake Road realignment eminent domain authority
The county asked Springfield for quick-take eminent domain authority so it can acquire land for the $50 million Cedar Lake Road realignment in Round Lake in time to keep a $19 million federal grant, which must be obligated by September 2028.
River and Roberts Roads roundabout safety redesign
The county is hiring Civiltech Engineering to design intersection improvements at Darrell and Roberts Roads — most likely a single-lane roundabout — with new trail connections to the Fox River Forest Preserve.
Envision 2050 long-range transportation plan
The county's 25-year transportation plan is entering its decision phase, modeling up to 75 future projects including roads, transit, and bike/pedestrian connections. Residents will get to weigh in through four public meetings, an online budgeting tool, and a student sign-design contest, with adoption expected spring 2027.
Bonner Road corridor improvements
Phase I engineering for Bonner Road between Darrell and Fairfield Roads, funded by motor fuel tax. Members hope to add a non-motorized path serving two schools and connecting to the Millennium Trail.
Hainesville Road improvements
The board approved a $1.76 million engineering contract plus $2.1 million in sales tax funds, along with agreements with Round Lake Beach, Round Lake Park, and Avon Township, to improve Hainesville Road from Washington Street to Rollins Road with sidewalks and multi-use paths.
Engineer recruitment and retention challenges
The Division of Transportation has five civil engineering positions vacant for about six months and is rethinking recruitment — including in-person career fairs — to compete for scarce graduates.
Winter road salt funding
The county is locking in $2 million of Motor Fuel Tax money for ice control salt ahead of the 2026-27 winter season.
Right-of-way acquisitions for future road widenings
Money was set aside to buy land — by agreement or condemnation if needed — for future improvements to Rollins Road ($600,000), Fairfield Road ($350,000) and Buffalo Grove Road ($300,000), all targeted around 2029.
Buffalo Grove Road rehabilitation
The committee funded land acquisition for new sidewalks, ADA ramps and crossings near the Buffalo Grove Road railroad tracks — an area members described as currently unsafe, with teens crossing tracks and streets near the township center and Stevenson High School. A new traffic signal and railroad gates are planned, with construction targeted for 2030.
Washington Street non-motorized improvements
The county is investing over $4.4 million in bike trails and sidewalks along Washington Street from Sextant Drive to Almond Road to improve safety for pedestrians and cyclists.
Bridge inspections and structural engineering services
The committee advanced several contracts keeping county and township roads in shape — crack sealing, asphalt patching, resurfacing in Cuba and Shields Townships, and a $2.15 million Dilleys Road bridge rehab over Mill Creek.
Washington Street/Route 21 intersection safety improvements
The Board funded a major bike path connector through Vernon Hills and Libertyville and safety upgrades at a hazardous Gurnee intersection, using quarter-cent transportation sales tax dollars.
Illinois Route 22 expansion
The county is upgrading its traffic-monitoring network with new fiber, underground splicing enclosures, and cameras on poles — including river cameras to watch flooding on the Des Plaines and Fox. Camera video is live-only; nothing is recorded.
Mundelein property conveyance to IDOT
A plan to transfer land from the state transportation department to Natural Resources and eventually the Forest Preserve is still on track — it's just moving at the pace of state government, not derailed as feared.
Martin Luther King Jr. Drive resurfacing
The county is resurfacing MLK Jr. Drive from Route 131 to Commonwealth Avenue with a $2.24 million construction contract plus $286,914 in engineering services. Smoother pavement should mean better rides for daily commuters.
Dilleys Road bridge rehabilitation
A $2.15 million contract will rehabilitate the Dilleys Road bridge over Mill Creek, keeping an important local crossing safe.