Civic Issues
Topics getting the most attention in Prospect Heights public meetings, ranked by how frequently they are discussed.
25 issues with high priority
Zen Leaf drive-through special use at 1434 N. Rand Rd.
Residents have been calling about the vacant property on Rand Road by the Speedway. The owner did some cleanup but the site isn't legally required to have safety fencing because there's no open excavation; the city will keep monitoring it.
Willow Road corridor stormwater projects
The city's stormwater drains into local creeks and the EPA monitors it. A new $7,750 contract with Gewalt Hamilton handles the required water sampling and paperwork, keeping the city in federal compliance.
Ward 5 aldermanic vacancy after Dolick resignation
Alderman Matt Dolick resigned after moving out of state, ending more than ten years on the council. His Ward 5 seat is now vacant and will need to be filled.
Zoning Code Update — General Provisions and Parking/Loading
The city is rewriting its zoning code, and this session covered the 'junk drawer' general provisions plus parking rules. Big debates: whether landscaping should count as a fence, limits on chain link fences, accessory structure sizes, and a new Illinois law banning parking requirements within a half mile of train stations.
Smaller commercial planned developments allowed
Most vacant lots on the city's main retail corridors are 20,000 sq ft, so the one-acre PUD minimum forces developers to assemble three parcels. Dropping it to 40,000 sq ft makes two-lot redevelopment possible, supporting the comprehensive plan's vision for Elmhurst, Euclid, Rand and Palatine.
West Camp McDonald Stormwater Flood Control Project
The council approved $283,000 for full design engineering of the long-planned flood control project for the area north of Camp McDonald, south of Willow, west of Schoenbeck, and east of Dale. This is the first step toward a shovel-ready project that can win construction grants.
Willow Road Sidewalk Project Grant Application
The city secured a ~$1.6 million state grant for a sidewalk from Wheeling Road to Wolf Road, with the city paying only about $176,700 (10%). The council's resolution formalizes its commitment.
City Financial Position
The city is running a $1.5 million General Fund surplus through nine months, with strong sales tax and new property tax revenue. Staff are chasing about $53,000 in delinquent sewer accounts in collections and mailed 100 more notices.
Neder Capital townhouse site sale
The 69-townhome PUD passed its second reading 3-2 despite a neighbor's objections that the development has only one entrance through small residential streets with no sidewalks, curbs, or streetlights. It's tied to a land swap with the Park District that funds new Muir Park improvements.
Zoning code rewrite underway
Consultant Teska is redrafting the city's decades-old zoning code — administration, planned development and districts first. Changes include administrative variations for small setbacks, a site plan review board, cheaper first-class-mail notice instead of certified mail, plain-language use tables, and fixed graphics. Adoption expected early next year.
PZBA wire-transfer scam warning
Scammers are reading city agendas and telling zoning applicants — including one local business and Sky Harbor — that they owe up to $5,000 in wire-transfer fees before final approval. The city will never ask you to wire money.
2027 Road Program and Willow Road sidewalk project
The $67,000 engineering contract is the first step to fix flooding along Elm Street — work that must be done before the Willow Road sidewalk residents requested can be built. Willow Road sidewalk money is in the road bond going before voters March 17.
Sky Harbour Executive Hangar Development at Chicago Executive Airport
The council finalized all zoning approvals for Sky Harbour's hangar project — rezoning, airport use, setback and height variations, flood storage, and re-subdivision. This locks in the land-use framework for the hangars along the Prospect Heights/Wheeling boundary.
East Side Commercial TIF District inducement
The council hired SB Friedman for TIF consulting on a proposed district along the Milwaukee Road corridor — an early step that could shape future redevelopment and tax increment funding in that corridor.
Elmhurst Road flooding and drainage
Resident John Anda described a broken drainage pipe on Dorset Street that floods his basement within minutes of heavy rain, asking the city to make it an official agenda item. Flooding remains the city's most common complaint, and the mayor noted the city must weigh individual fixes against citywide policy.
Sky Harbour Development Boundary Adjustment with Wheeling
Seven airport hangars straddle the Prospect Heights–Wheeling line, so the two towns are permanently swapping land — one hangar to Wheeling territory, a compensating parcel to Prospect Heights — under a new intergovernmental agreement. Prospect Heights keeps building-code authority and the Chicago Executive Airport pays both communities' costs.
Road Patching and Infrastructure Updates
Alderman Morgan-Adams flagged poor pothole repairs on state and county roads. Staff explained the city notifies IDOT and Cook County directly and encourages residents to call as well; the city engineer will seek a timeline for Schoenbeck Road resurfacing.
Sky Harbor hangar development at Chicago Executive Airport
A multi-year hangar project will come before the board July 22, needing a map amendment, special use, lot-line variation and stormwater relief. It also involves a boundary shift with Wheeling, with Prospect Heights becoming the permitting agency for six of seven hangar buildings.
Camp McDonald sidewalk gaps and pedestrian safety
Residents are pushing for sidewalks along Camp McDonald, especially near Schoenbeck, where a daycare group walks children on the grass beside traffic. The city says it can only build sidewalks with 80% grant funding; the funded Camp McDonald sidewalk was pushed to next year by a new IDOT railroad permit requirement.
Sanitary sewer inspection and maintenance program
The city is spending roughly $330,000 to video-inspect its entire sanitary sewer system for the first time in nine years, manage the resulting data, and buy a new high-definition camera. The goal is catching deteriorating pipes early and holding whoever damages sewers — residents, contractors, or utilities — financially responsible.
Willow Trails Stormwater Project Supplemental Cost
The flood control project hit unexpected costs — asbestos pipes, unmapped water mains, winter cold-patching — adding $192,336. Thanks to a $2.4 million federal grant, the city's share stays under its $800,000 budget at roughly $790,000, and officials say the project remains on track for spring completion.
Garbage Collection Contract Extension with Flood Brothers
Residential garbage rates stay flat for another year starting July 1, but commercial customers will see a 3% increase. The city will seek a long-term contract next time.
Road Bond Capital Expenditure Reimbursement
Public Works reminded residents the proposed road bond referendum — set for the March 17 agenda — funds road maintenance and the Willow Road sidewalk, and encouraged anyone with questions to contact the city.