12 issues in water utilities

HighWater Utilities

Kipling Estates shared drain tile drainage problems

A resident at 1004 Conrad Lane says storm water backs into her basement because a shared drain tile serving five homes is backing up and no one — including the village — can locate where it runs. She's spent about $2,000 on plumbers and scoping and asked the village to help find a workable connection point before winter.

4 mentions (1 this month)Last discussed Nov 10, 2026
HighWater Utilities

River Road Lift Station Expansion

Shorewood's Seil Road lift station handles about 65% of village wastewater and gets overwhelmed in heavy rains. This study is step one of an expansion that could divert flow and keep up with growth on the village's west side.

2 mentions (1 this month)Last discussed Oct 27, 2026
HighWater Utilities

River Lift Station maintenance

Shorewood's Seil Road lift station handles about 65% of village wastewater and gets overwhelmed in heavy rains. This study is step one of an expansion that could divert flow and keep up with growth on the village's west side.

2 mentions (1 this month)Last discussed Oct 27, 2026
MediumWater Utilities

Water System Maintenance Contracts

Leak surveys across 100 miles of water mains and valve exercising on 1,260 valves were re-upped — routine work that gets more critical as Shorewood switches from wells to Lake Michigan water.

2 mentionsLast discussed Oct 13, 2026
LowWater Utilities

Water tower maintenance and equipment purchases

The Black Road water tower gets cleaned and inspected a year early because of visible mildew, and Public Works replaces its undersized 2005 trailer. Both fit within existing budget lines.

1 mentionLast discussed Sep 22, 2026
MediumWater Utilities

Grand Prairie Water Commission tree removal bids

Tree-clearing bids for the Hammel Woods and Cal-Sag areas came in far below engineers' estimates — saving the Village serious money on the water commission projects.

1 mentionLast discussed Sep 22, 2026
MediumWater Utilities

Water meter replacement costs shift to property owners

If your water meter freezes or is damaged before the end of its life, you — not the Village — will pay to replace it. Normal wear-and-tear replacements (about every 15 years) remain free.

1 mentionLast discussed Sep 8, 2026
MediumWater Utilities

Grand Prairie Water Commission project update

No update on the water commission this time, but bid packages are being finalized — progress on regional water infrastructure that affects future water service for residents.

2 mentionsLast discussed Aug 25, 2026
MediumWater Utilities

Water meter damage responsibility ordinance

A first-read ordinance would make homeowners pay for water meters ruined by freezing or other damage — unless it was tampering or normal wear-out. It's mostly about empty houses in winter; the Board takes it up again in two weeks.

1 mentionLast discussed Aug 25, 2026
MediumWater Utilities

Grand Prairie Water Commission project progress

The regional water project is moving: designs are 60% to 90% complete and bids are being prepped, but the IDNR denied permits for the Des Plaines River crossing, forcing a hunt for a new location. Village valve stations are 95% done and the corrosion study is nearly finished.

1 mentionLast discussed Jul 28, 2026
MediumWater Utilities

Sanitary sewer infiltration and inflow — Basin 2 rehab

The next phase of the sewer program targets manhole rehabilitation in Basin 2, with about $400,000 budgeted. It keeps stormwater out of the sanitary sewer system.

1 mentionLast discussed Jul 28, 2026
HighWater Utilities

Western sewer and water expansion and future development

Shorewood is nearing its 4-million-gallon-per-day wastewater capacity limit with Joliet. Paying $130,000 now to reserve space in an upsized Rock Run sewer line avoids far costlier permitting later when the village needs more capacity.

3 mentionsLast discussed Jul 28, 2026