Civic Issues
Topics getting the most attention in Westchester public meetings, ranked by how frequently they are discussed.
3 issues in water utilities with medium priority
Replacing the Public Works underground fuel system
The Village's 1970s-80s underground fuel tanks face a 2028 state compliance deadline. Rather than spend $100,000+ patching them, the Village is building a $238,000 above-ground fuel island with a DEF dispenser, then removing the old tanks in FY 2028 with 60% IEPA reimbursement.
Emergency notification system switch to Everbridge
The village has switched from Code Red to Everbridge for emergency alerts. Residents must re-register — even if they were signed up before — on the website homepage to keep getting water main break, snow parking, and road closure alerts.
Sewer point repairs and concrete restoration
Ten failing sewer pipe sections were found during camera inspections — five will be dug up by John Neri Construction, five done in-house. Impressive Construction will fix winter-damaged curbs, sidewalks and driveway aprons.