Civic Issues
Topics getting the most attention in Homer Glen public meetings, ranked by how frequently they are discussed.
21 issues with high priority
151st Street reconstruction
An $18,000 payment to Polach Appraisal Group continues right-of-way acquisition work for the 151st Street improvement project.
13412 W. 159th Street redevelopment (Case HG-2625-ASPSUP)
A proposed commercial development would be rezoned from C-2 to C-3 and include a drive-through, with a long list of variances on parking, setbacks, landscaping and cross-access. If approved, it changes what can be built on a visible 159th Street corridor parcel.
Long Run Creek Flood Management
The board will consider creating a dedicated Long Run Creek Task Force by ordinance, chaired by Trustees Schaller and Muller, followed by an update on Long Run Creek itself. The task force would focus village attention on the creek's issues.
Heritage Park Phase One — veterans memorial and water feature
Two items touch Heritage Park: design work for the Veteran's Memorial and Water Feature, and an insurance waiver so K Brothers Fence can work on the tennis and pickleball courts.
Oak Meadow Lot 5 Lot-Width Variance
A vacant wooded corner lot near the Forest Preserve is up for sale, and a variance would shrink the required corner-lot width from 180 to 140 feet so a home can be built. Neighbors oppose it, citing tree preservation and the lack of any actual home plans.
2026 Road Resurfacing and Sidewalk Repairs
The board paid M&J Asphalt $1.24 million for this year's road resurfacing, holding back $65,469 until punch-list items are finished.
Cedar Road Fiddyment Creek Sanitary Sewer Extension
A $528,645.60 pay estimate was approved for the sewer extension project.
Parker Road speeding and traffic safety
A 10-year Oak Ridge resident told the board his neighborhood has become the 'Indianapolis 500' since the speed monitor came down, and offered his property for enforcement cameras. Trustee Mason pledged to raise it with the sheriff's lieutenant.
Goodings Grove PUD Phase 2 Minor Change
Homebuyers in Goodings Grove Phase 2 will get more floor plan options after the board approved minor PUD changes — same heights, materials, and a slightly revised landscaping plan.
Hidden Valley Phase 2
A townhome planned unit development at 159th and Hidden Valley Trail got a unanimous recommendation, including keeping two ponds that neighborhood kids fish in. A resident asked the commission to preserve open space and fishing access; a split-rail fence around the south pond was discussed as a suggestion, not a condition.
Dirt Bike and E-Bike Safety on Paths
Village paths are being torn up by dirt bikes, four-wheelers, and even cars, damaging the turf in a grant-funded park area. Police will ticket violators and the manager wants residents to help identify offenders.
Tree Preservation on Private Property
A stronger Private Tree Ordinance goes to the Village Board on July 22 for tougher tree protections across the Village.
Illinois American Water Rate Increase Opposition
Illinois American Water is seeking another rate hike and planning a merger; the village is urging residents to file objections with the state commerce commission.
New playground at Lamers Park and other park improvements
The village is pricing new pickleball courts at Goodings Grove Park — Homer Glen is below the per-capita standard — and pursuing a 50% grant match from Cunningham Recreation for a Gorham Park playground renovation.
Tobacco Sales Code Enforcement Gaps
Stores caught selling tobacco to minors currently face little consequence until license renewal — sometimes nearly a year later. The president wants a graduated penalty structure: fine, then suspension, then revocation. Trustees will submit ideas for a code rewrite.
Tree Preservation Ordinance (Ordinance No. 26-043)
The proposed update to the village's 20-year-old tree regulations would protect mature trees on private property through permits, tiered mitigation fees, and replanting requirements, phased in from 1.5-acre lots in 2027 down to half-acre lots by 2031. Trustees could not agree on lot thresholds, the commercial tier, or new-construction buffers and tabled it for further negotiation.
Lot coverage variance at 12412 W. Mackinac Road
A proposed ranch home plus detached garage would push a small lot from 20% to 26.76% coverage on a lot where trees were clear-cut in 2025. Neighbors report flooding, erosion and lost privacy, and the Village Engineer warns more pavement could strain the subdivision's stormwater system and flood homes downstream.
Comprehensive Plan Update and Development Financing Tools
The village picked a consultant to update its Comprehensive Plan, but Acting Chair McGary warned it can't be delayed — the outdated plan makes Homer Glen ineligible for grants. She urged real community engagement so it doesn't repeat the unwanted direction of the last plan.
Standalone Dunkin' Drive-Through at 151st and Bell
A standalone Dunkin' replacing a forested farm parcel drew pushback over clear-cutting trees, a fourth Dunkin' within a short radius, and mounting sign variances. Commissioners shared the tree concerns but recommended the whole package forward anyway, with conditions on the trash enclosure and detention-basin landscaping.
Storm damage and ComEd trail safety
Storms knocked down over 40 trees; crews are clearing roads. Residents near Founders Crossing reported static shocks and crackling wires on a walking path near ComEd equipment, and the village may close the path while ComEd investigates.
Goodings Grove School parking lot expansion and underground detention
The school district wants ~50 more stalls plus new stormwater detention to ease morning congestion and keep kids away from bus traffic. The Plan Commission agreed parking has been needed for years, but a Board variance is still needed for underground detention.