Civic Issues
Topics getting the most attention in Oak Lawn public meetings, ranked by how frequently they are discussed.
50 issues
St. Linus Turkey Trot 5K Fee Waiver
The Lions Club's 16th annual 5K got approved, but Sunday overtime for Public Works pushes village costs to $7,268. The mayor asked the club to consider a Saturday date next year to cut costs.
Special Homestead Exemption Home Building Program
The village plans to hire Leeside Builders to construct homes on roughly a dozen nuisance, tax-delinquent properties it has acquired, starting with two homes. New homes would come with 10 years of tax rebates to attract young families, and Desmond resigned to lead the effort.
2026 Sanitary Sewer Rehabilitation and CDBG Funding
The consent package locked in engineering for the 2026 sanitary sewer rehabilitation (up to $141,500), Phase II street resurfacing design, and reimbursement financing for the Polaris Park flood control project.
Police Union Collective Bargaining Agreement
A resolution was on the agenda to approve the village's contract with the Metropolitan Alliance of Police, Chapter #309 — the agreement that sets police pay and working conditions.
Lead Service Line Replacement and Water Inventory
The village approved up to $554,525 for engineering services in 2026 to replace lead water service lines — the aging pipes that can leach lead into drinking water. Work will hit neighborhoods as lines get swapped out.
2027 Street Resurfacing Program Engineering
The Traffic & Safety Commission wanted a two-way stop, but Trustee Mallo — a former driver's ed instructor who called the intersection one of the most dangerous on his routes — pushed it to a four-way. The Board agreed unanimously.
Proposed 2027 Budget
Trustee Mallo flagged that Illinois has cut the village's share of local government distributive fund money from 10% down to 6%, costing the village millions that could fund pensions and police. The Southwest Conference of Mayors is lobbying to restore it.
Home-based firearm dealer license ordinance
A proposed ordinance would amend Village business and zoning regulations to create license classes for gunsmithing, firearm transfers, and home-based firearm dealers — new rules affecting where and how these businesses may operate in the Village.
2027 Sidewalk and Concrete Repair Programs
Two proposed contracts with Dale, Inc. would fund removal and replacement of public sidewalks (up to $49,500) and curb, gutter and driveway concrete (up to $275,000) in 2027. The 50/50 sidewalk program typically shares costs with property owners.
McCormick lawsuit settlement
A second proposed settlement agreement in the Mary McCormick lawsuit against the Village was on the consent agenda.
Mabon lawsuit settlement
The Village was set to consider paying $125,000 to settle a lawsuit over an August 2025 accident in which a police officer made a U-turn on 95th Street and struck a driver's vehicle. The original demand was $500,000; negotiations brought it down to $125,000.
March 17 election and early voting
The Clerk's report was scheduled to include election information, following early voting that began at the Oak Lawn Library on October 19 and ran through November 2.
Third-party plan review cost reimbursement
A proposed building-code amendment would allow the Village to pass through or reimburse third-party plan review costs as part of building permits, potentially affecting permit fees for new construction and remodels.
Regional Water System transmission main change orders
The board approved nearly $976,500 in additional change orders for the water transmission main project (Bid Package No. 5). This ongoing infrastructure work affects water service reliability for village residents.
Polaris detention project completion
The stormwater detention project is moving along — excavation is 70% done, the field underdrain about half done, with grass planting expected in August-September. A main storm drain along 105th Street means torn-up streets, but officials say it'll benefit the whole district.
Storm debris cleanup progress
Public Works removed roughly 875 tons of tree debris plus 400 tons of lighter debris after one of the worst storm seasons in memory. Residents with remaining debris should contact the village, but backyard branch pickup won't continue.
2027 Tree Pruning and Removal Services Contract
The village awarded a $520,160 contract to Smitty's Tree Service for next year's tree trimming and removal work across the village.
Fire apparatus Unit E2 emergency repairs
The village's 2008 fire engine is out of service due to frame and pump problems. The board approved up to $93,056.11 in repairs to extend its life about two years while a replacement is procured; a reserve truck will cover responses in the meantime.
Underage e-scooter and mini-bike safety
Police wrote 18 citations last weekend as enforcement of the village's e-scooter ordinance ramps up, after two girls riding a scooter were struck by a car. Officials are circulating a one-page explainer to schools and social media explaining who can legally ride what.
Retention (stormwater) project near completion
The Polaris Field detention project is ahead of schedule, with field excavation 70% done and the storm drain reaching 105th Street. Residents face street closures for a couple more months.
Nycor infrastructure project update
The year-long water/infrastructure project from 87th to 93rd Street lagged until July; now under weekly oversight, the contractor says it will finish before the snow flies.
Police accountability and treatment of Arab community
Roughly 18 speakers, most from outside the village, demanded accountability for Oak Lawn police conduct, including the failure to test a driver who killed Murad Kurdi in 2023 and the forceful removal of a 14-year-old from an August 5 Fire and Police Commission meeting. Many demanded the board request an independent Attorney General investigation. The board took no action during the meeting.
O.A.K. Residential Construction and Sales Program
Through the consent agenda, the board created a new village housing program — O.A.K. (Opportunity, Affordability, Keystone) — authorizing construction and sale of homes, including waiving competitive bidding so the village can negotiate directly with general contractors.
Security fogger ordinance targets gaming burglaries
Crews are smashing into video gaming businesses across the Southland in under two minutes, including one Oak Lawn hit the morning of the meeting. The mayor is pushing the stalled one-penny-per-push tax and blaming state sentencing rules for repeat offenders.
Clean FY2025 audit
Independent auditors Baker Tilly gave the village the best opinion possible — clean, with no complaints and no internal-control findings. Pension funds grew by $28.4 million to about $219 million.
Nicor Gas Restoration Failures
Residents on Austin Avenue got no notice of gas main work on their properties, and the 89th-to-93rd Street project has left torn-up sidewalks for nearly a year. Trustees unloaded on Nicor reps, who agreed to weekly check-ins and better notification — including possible door hangers via village staff.
Backyard chickens request
A young resident asked the board to allow a few backyard chickens for eggs. The mayor said it's been raised before and comes down to rodents and health concerns — no change coming.
Polaris Stormwater Detention Project
Trustee Soch told District 6 residents the stormwater pipe retention project is actually a bit ahead of schedule, despite temporary water, cable, and internet disruptions during construction. He asked for patience and pointed residents to the project hotline on the village website.
District 1 Trustee vacancy filled
Tim Desmond's resignation leaves District 1 without a trustee until the 2027 election. The mayor wants resumes by May 20 and will interview candidates before appointing someone with board consent.
Nycor construction project delays
The Nycor project in District 2, started back in 2015's funding cycle, still isn't done and now won't finish until October. Trustee Olejniczak wants a full timeline and accountability; Nycor will appear at the July 28 meeting.
$15.5 Million General Obligation Bonds, Series 2026
The village is borrowing up to $15.5 million, with a direct annual tax levy pledged to pay back principal and interest.
New Ambulance Cots for Fire Department
The village skipped competitive bidding to buy five powered ambulance cots and power-load systems for the fire department — equipment that protects paramedics' backs and speeds patient loading.
2026 Street Program - Phase 2
Lindahl Brothers will resurface village streets this year under a contract up to $3,379,521.87.
EDGE youth program graduation
Trustee Soch and the mayor attended the EDGE graduation at St. Catharines, praising the anti-gang education program for sixth graders run by Officers Marco Dominguez and Tom McMahon.
Resident concerns over Nahda Center and community change
Resident Irene Mahoney returned to say her March complaint about an amplified speaker atop the Nahda Center was never truly addressed, and expanded into broad concerns about demographic change, traffic, and the new mosque/community center being built. The mayor made clear her views are her own, not the village's.
Squatter removal under new Illinois law
Trustees credited staff and police for clearing squatters from a rental home in about 30 days — something that used to take six months to a year under the old eviction process. It was the village's first test of the new law, and officials say repeat offenses will be prosecuted.
Police department hiring and fleet replacement
The police department gets fourteen new Motorola radios to replace obsolete gear, and Public Works swaps a 2003 plow truck for a new snow fighter package truck.
Parking variation at 6701 W. 95th Street
Dr. Daniel Troy's C-2 zoned property at 6701 W. 95th Street received a parking variation, following the zoning and planning commission's recommendation.
Timely elevator repairs in residential buildings
A new ordinance requires apartment and condo buildings to restore broken elevator service promptly. Residents with mobility issues were waiting weeks — one elevator was out nearly 60 days — and some called ambulances just to get up and down stairs.
Events Commission reorganization
The commission was trimmed from more than seven members to seven, matching other village commissions, with long-time volunteers including 18-year member Cheryl Daly stepping back but still helping at events.
95th Street downtown street lighting upgrades
Three resolutions advance lighting upgrades along Cicero Avenue from 89th to 111th and 95th Street downtown, using local grant funds plus engineering from Strand Associates.
Noise ordinance concerns
Resident Irene Mahoney asked whether the village has noise ordinances, citing concerns about loudspeakers from new mosques. The mayor pointed her to the village manager for details.
Social Services Commission nonprofit funding
The village has about $461,000 in franchise-fee money to give to local nonprofits. Applications are due March 31, with awards expected the last week of April.
Police graffiti arrests and camera-sharing program
Police arrested two juveniles for February 12 graffiti after a resident sent photos. Officials urged residents to register home cameras through the village's FUCSIS program or send video tips.
OLREC 9-1-1 call-handling system maintenance renewal
The village renewed maintenance on the Intrado Viper call-handling system that keeps the regional 9-1-1 center running, at up to $61,543 for year six of the service agreement.
New liquor and video gaming licenses for local restaurants
WingSnob on 95th Street and the planned W96 venue at 9600 S. Pulaski both received liquor licenses, with video gaming at both. New dining-and-drinking spots mean new options — and gaming revenue for the village.
Public Works fleet replacement — new dump truck
Public Works is swapping out a 2003 Ford F-450 for a new 2025 model, costing up to $78,838. The old truck will be sold, with competitive bidding waived.
Four-way stop at 101st Street and Kildare Avenue
Neighbors at 101st and Kildare got the four-way stop they asked for, after a unanimous Traffic and Safety Commission recommendation. It should slow traffic at the intersection.
Pulaski Road rezoning to C-2 General Commercial
The 9600–9652 S. Pulaski Road office properties were rezoned to general commercial, so businesses like the planned W96 venue can open without each tenant filing its own zoning petition. It clears the way for more retail and restaurant activity on the corridor.
Water leak testing phone scam
Someone is calling residents claiming the village hired a restoration company to test for water leaks. It hasn't — officials say hang up and call Public Works to verify.